Critical Success Factors for Different Components of Construction Projects

被引:67
作者
Kog, Yue Choong [1 ]
Loh, Ping Kit [2 ]
机构
[1] EW Engn Consultants, Singapore 269022, Singapore
[2] Natl Univ Singapore, Dept Civil Engn, Singapore 238875, Singapore
来源
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE | 2012年 / 138卷 / 04期
关键词
Critical success factors; Project objectives; Construction professionals; Analytical hierarchy process; IMPLEMENTATION; PERFORMANCE;
D O I
10.1061/(ASCE)CO.1943-7862.0000464
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The present study attempts to distinguish the different critical success factors (CSFs) for different components of construction projects as perceived by different professions, i.e., civil and structural engineers, mechanical and electrical engineers, architects, and quantity surveyors. An analytical hierarchy process (AHP) is adopted to solicit the consistent subjective judgment of 27 experts in construction to identify the top 10 CSFs from 67 factors describing aspects of project characteristics, contractual arrangements, project participants, and interactive processes. The views of the different professionals are shaped by the experience they gained from their involvement in the respective components of the construction projects under their charge. It follows that the CSFs identified by the professionals are naturally relevant to the components of construction projects that they are familiar with. The present study reveals that the respective top 10 CSFs for the schedule, budget, and quality performance of architectural works, civil and structural works, and mechanical and electrical engineering works are markedly different. Moreover, the study shows that the judgment with regard to CSFs of respondents with less than 15 years of experience differs from that of the more experienced respondents and hence may not be good enough. It follows that studies reported in the existing literature that have included views of respondents with less than 15 years' experience in construction or based on the views of professionals predominantly from a particular discipline are likely to be biased and misleading. DOI: 10.1061/(ASCE)CO.1943-7862.0000464. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:520 / 528
页数:9
相关论文
共 31 条
[1]   ANALYSIS OF CLIENT-SATISFACTION FACTORS IN CONSTRUCTION-INDUSTRY [J].
AHMED, SM ;
KANGARI, R .
JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) :36-44
[2]   Modeling project performance for decision making [J].
Alarcon, LF ;
Ashley, DB .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1996, 122 (03) :265-273
[3]  
[Anonymous], 1982, SEARCH EXCELLENCE LE
[4]  
*ASCE CONSTR MAN C, 1991, J CONSTR ENG MANAGE, V117, P67
[5]  
Baker B., 1983, PROJECT MANAGEMENT H, P669
[6]  
Chan D. W. M., 1997, International Journal of Project Management, V15, P55, DOI 10.1016/S0263-7863(96)00039-7
[7]   Critical success factors for different project objectives [J].
Chua, DKH ;
Kog, YC ;
Loh, PK .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1999, 125 (03) :142-150
[8]   Model for construction budget performance - Neural network approach [J].
Chua, DKH ;
Kog, YC ;
Loh, PK ;
Jaselskis, EJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1997, 123 (03) :214-222
[9]   ARE CONTRACT DISPUTES PREDICTABLE [J].
DIEKMANN, JE ;
GIRARD, MJ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1995, 121 (04) :355-363
[10]  
Goldsmith M., 1984, WINNING STREAK, P139