Integrating production and transportation scheduling in a two-stage supply chain

被引:10
作者
Liao, Ching-Jong [1 ]
Kuo, Yu-Wei [1 ]
Chung, Tsui-Ping [2 ]
Shih, Stephen C. [3 ]
机构
[1] Natl Taiwan Univ Sci & Technol, Dept Ind Management, Taipei 106, Taiwan
[2] Jilin Univ, Coll Mech Sci & Engn, Changchun 130025, Peoples R China
[3] So Illinois Univ, Sch Informat Syst & Appl Technol, Carbondale, IL 62901 USA
关键词
electromagnetism-like mechanism; scheduling; two-stage supply chain; transportation; DELIVERY CONSIDERATIONS; ALGORITHM; MINIMIZE;
D O I
10.1504/EJIE.2015.069344
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper is concerned with the research on coordinated scheduling of production and transportation in a two-stage supply chain. The first stage involves scheduling multiple suppliers with various production speeds while the second stage deals with the scheduling job of several vehicles under the assumption that each vehicle is travelling at a different speed and has different transport capacity. The primary objective of this research is to minimise the maximum completion time for all jobs. With that, a new heuristic is proposed and an electromagnetism-like mechanism (EM) algorithm is developed for searching a near optimal or optimal solution. Computational results show that the proposed EM algorithm embedded with the heuristic significantly is better than an existing gendered genetic algorithm, with an average improvement of 20.66% while using much less computation time.
引用
收藏
页码:327 / 343
页数:17
相关论文
共 21 条
[1]   Supply chain coordination: Perspectives, empirical studies and research directions [J].
Arshinder, S. ;
Kanda, Arun ;
Deshmukh, S. G. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2008, 115 (02) :316-335
[2]   An electromagnetism-like mechanism for global optimization [J].
Birbil, SI ;
Fang, SC .
JOURNAL OF GLOBAL OPTIMIZATION, 2003, 25 (03) :263-282
[3]   A hybrid electromagnetism-like algorithm for single machine scheduling problem [J].
Chang, Pei-Chann ;
Chen, Shih-Hsin ;
Fan, Chin-Yuan .
EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (02) :1259-1267
[4]  
Chen Z.L., 2010, OPER RES, V58, P1711
[5]   A hybrid scatter search/electromagnetism meta-heuristic for project scheduling [J].
Debels, D ;
De Reyck, B ;
Leus, R ;
Vanhoucke, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 169 (02) :638-653
[6]  
Debels D, 2006, LECT NOTES COMPUT SC, V3871, P259
[7]   Integrated production/distribution planning in supply chains [J].
Erengüç, SS ;
Vakharia, AJ .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 115 (02) :217-218
[8]   Production scheduling problem with delivery considerations in a mono-product supply chain environment to minimise the total joint cost [J].
Grunder, Olivier ;
Wang, Deyun ;
El Moudni, Abdellah .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2013, 7 (05) :615-634
[9]   Supply chain scheduling: Batching and delivery [J].
Hall, NG ;
Potts, CN .
OPERATIONS RESEARCH, 2003, 51 (04) :566-584
[10]  
Ivanov D., 2010, CENTRAL EUROPEAN J O, V19, P299