Quantile regression metamodeling: Toward improved responsiveness in the high-tech electronics manufacturing industry

被引:11
作者
Batur, Demet [1 ]
Bekki, Jennifer M. [2 ]
Chen, Xi [3 ]
机构
[1] Univ Nebraska, Supply Chain Management & Analyt, Lincoln, NE 68588 USA
[2] Arizona State Univ, Ira A Fulton Schools Engn, Polytech Sch, Mesa, AZ 85251 USA
[3] Virginia Tech, Grado Dept Ind & Syst Engn, Blacksburg, VA 24601 USA
关键词
Manufacturing; Lead-time quotation; Simulation metamodeling; Predictive analytics; TIME; SELECTION; SYSTEMS; CURVES;
D O I
10.1016/j.ejor.2017.06.020
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Both technology and market demands within the high-tech electronics manufacturing industry change rapidly. Accurate and efficient estimation of cycle-time (CT) distribution remains a critical driver of on time delivery and associated customer satisfaction metrics in these complex manufacturing systems. Simulation models are often used to emulate these systems in order to estimate parameters of the CT distribution. However, execution time of such simulation models can be excessively long limiting the number of simulation runs that can be executed for quantifying the impact of potential future operational changes. One solution is the use of simulation metamodeling which is to build a closed-form mathematical expression to approximate the input output relationship implied by the simulation model based on simulation experiments run at selected design points in advance. Metamodels can be easily evaluated in a spreadsheet environment "on demand" to answer what-if questions without needing to run lengthy simulations. The majority of previous simulation metamodeling approaches have focused on estimating mean CT as a function of a single input variable (i.e., throughput). In this paper, we demonstrate the feasibility of a quantile regression based metamodeling, approach. This method allows estimation of CT quantiles as a function of multiple input variables (e.g., throughput, product mix, and various distributional parameters of time-between-failures, repair time, setup time, loading and unloading times). Empirical results are provided to demonstrate the efficacy of the approach in a realistic simulation model representative of a semiconductor manufacturing system. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:212 / 224
页数:13
相关论文
共 36 条
[1]   STATISTICAL PREDICTOR IDENTIFICATION [J].
AKAIKE, H .
ANNALS OF THE INSTITUTE OF STATISTICAL MATHEMATICS, 1970, 22 (02) :203-&
[2]  
Alexopoulos C., 2012, P 2012 WINTER SIMULA, P1
[3]   Accurate Emergency Department Wait Time Prediction [J].
Ang, Erjie ;
Kwasnick, Sara ;
Bayati, Mohsen ;
Plambeck, Erica L. ;
Aratow, Michael .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2016, 18 (01) :141-156
[4]  
Ankenman BE, 2011, INT SER OPER RES MAN, V151, P565, DOI 10.1007/978-1-4419-6485-4_19
[5]   Setting Planned Leadtimes in Customer-Order-Driven Assembly Systems [J].
Atan, Zumbul ;
de Kok, Ton ;
Dellaert, Nico P. ;
van Boxel, Richard ;
Janssen, Fred .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2016, 18 (01) :122-140
[6]   SIMULATION OPTIMIZATION USING METAMODELS [J].
Barton, Russell R. .
PROCEEDINGS OF THE 2009 WINTER SIMULATION CONFERENCE (WSC 2009 ), VOL 1-4, 2009, :230-238
[7]  
Bekki JM, 2014, WINT SIMUL C PROC, P3880, DOI 10.1109/WSC.2014.7020214
[8]   Indirect cycle time quantile estimation using the Cornish-Fisher expansion [J].
Bekki, Jennifer M. ;
Fowler, John W. ;
Mackulak, Gerald T. ;
Nelson, Barry L. .
IIE TRANSACTIONS, 2010, 42 (01) :31-44
[9]  
Boyaci T, 2006, PROD OPER MANAG, V15, P179, DOI 10.1111/j.1937-5956.2006.tb00239.x
[10]   Exploratory Quantile Regression With Many Covariates An Application to Adverse Birth Outcomes [J].
Burgette, Lane F. ;
Reiter, Jerome P. ;
Miranda, Marie Lynn .
EPIDEMIOLOGY, 2011, 22 (06) :859-866