Short-Term Earthquake Forecasting Using Early Aftershock Statistics

被引:25
|
作者
Shebalin, Peter [1 ]
Narteau, Clement [2 ]
Holschneider, Matthias [3 ]
Schorlemmer, Danijel [4 ]
机构
[1] Int Inst Earthquake Predict Theory & Math Geophys, Moscow 117997, Russia
[2] Inst Phys Globe, Lab Dynam Fluides Geol, F-75252 Paris 05, France
[3] Univ Potsdam, Inst Appl & Ind Math, D-14115 Potsdam, Germany
[4] Univ So Calif, Dept Earth Sci, Los Angeles, CA 90089 USA
关键词
LAW; MODELS; DECAY; PREDICTION; STRESS; PREDICTABILITY; STRATEGIES; CALIFORNIA; MAGNITUDE; RATES;
D O I
10.1785/0120100119
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
We present an alarm-based earthquake forecast model that uses the early aftershock statistics (EAST). This model is based on the hypothesis that the time delay before the onset of the power-law aftershock decay rate decreases as the level of stress and the seismogenic potential increase. Here, we estimate this time delay from < t(g)>, the time constant of the Omori-Utsu law. To isolate space-time regions with a relative high level of stress, the single local variable of our forecast model is the E-a value, the ratio between the long-term and short-term estimations of < t(g)>. When and where the E-a value exceeds a given threshold (i.e., the c value is abnormally small), an alarm is issued, and an earthquake is expected to occur during the next time step. Retrospective tests show that the EAST model has better predictive power than a stationary reference model based on smoothed extrapolation of past seismicity. The official prospective test for California started on 1 July 2009 in the testing center of the Collaboratory for the Study of Earthquake Predictability (CSEP). During the first nine months, 44 M >= 4 earthquakes occurred in the testing area. For this time period, the EAST model has better predictive power than the reference model at a 1% level of significance. Because the EAST model has also a better predictive power than several time-varying clustering models tested in CSEP at a 1% level of significance, we suggest that our successful prospective results are not due only to the space-time clustering of aftershocks.
引用
收藏
页码:297 / 312
页数:16
相关论文
共 50 条
  • [21] USING SHORT-TERM STATISTICS FOR ANALYSES IN THE REPUBLIC OF MOLDAVIA
    Anghelache, Constantin
    Cara, Oleg
    ROMANIAN STATISTICAL REVIEW, 2012, (10) : 22 - 34
  • [22] SHORT-TERM LOAD FORECASTING
    GROSS, G
    GALIANA, FD
    PROCEEDINGS OF THE IEEE, 1987, 75 (12) : 1558 - 1573
  • [23] FORECASTING SHORT-TERM DEMAND
    REISMAN, A
    GUDAPATI, K
    CHANDRASEKARAN, R
    DARUKHANAVALA, P
    MORRISON, D
    INDUSTRIAL ENGINEERING, 1976, 8 (05): : 38 - 45
  • [24] SHORT-TERM ECONOMIC FORECASTING
    Hoadley, Walter E., Jr.
    JOURNAL OF MARKETING, 1955, 20 (01) : 96 - 97
  • [25] Short-Term Load Forecasting Using AMI Data
    Mansoor, Haris
    Ali, Sarwan
    Khan, Imdad Ullah
    Arshad, Naveed
    Khan, Muhammad Asad
    Faizullah, Safiullah
    IEEE INTERNET OF THINGS JOURNAL, 2023, 10 (24) : 22040 - 22050
  • [26] Short-Term Load Forecasting Using Fuzzy Logic
    Blancas, Jordan
    Noel, Julien
    PROCEEDINGS OF THE 2018 IEEE PES TRANSMISSION & DISTRIBUTION CONFERENCE AND EXHIBITION - LATIN AMERICA (T&D-LA), 2018,
  • [27] Short-term load forecasting using Theta method
    Dudek, Grzegorz
    14TH INTERNATIONAL SCIENTIFIC CONFERENCE FORECASTING IN ELECTRIC POWER ENGINEERING (PE 2018), 2019, 84
  • [28] Using deep learning for short-term load forecasting
    Nadjib Mohamed Mehdi Bendaoud
    Nadir Farah
    Neural Computing and Applications, 2020, 32 : 15029 - 15041
  • [29] Short-Term Load Forecasting Using Random Forests
    Dudek, Grzegorz
    INTELLIGENT SYSTEMS'2014, VOL 2: TOOLS, ARCHITECTURES, SYSTEMS, APPLICATIONS, 2015, 323 : 821 - 828
  • [30] Short-Term Demand Forecasting By Using ANN Algorithms
    Singh, Astha
    Sahay, Kishan Bhushan
    2018 6TH INTERNATIONAL ELECTRICAL ENGINEERING CONGRESS (IEECON), 2018,