Probabilistic calibration for development length models of deformed reinforcing bar

被引:11
作者
Yu, Bo [1 ]
Tang, Ruikai [1 ,2 ]
Li, Bing [3 ]
机构
[1] Guangxi Univ, Guangxi Key Lab Disaster Prevent & Engn Safety, Key Lab Engn Disaster Prevent & Struct Safety Chi, Minist Educ,Sch Civil Engn & Architecture, Nanning 530004, Peoples R China
[2] Guangxi Rd & Bridge Engn Grp Co Ltd, Nanning 530011, Peoples R China
[3] Nanyang Technol Univ, Sch Civil & Environm Engn, Singapore 639798, Singapore
基金
中国国家自然科学基金;
关键词
Deformed reinforcing bars; Concrete; Development length; Probabilistic calibration; Confidence level; Confidence interval; BOND STRENGTH; PULL-OUT; DESIGN; CORROSION; CRACKING; COVER;
D O I
10.1016/j.engstruct.2018.12.047
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In order to provide a scientific basis for choosing the appropriate development length models, a probabilistic calibration method was developed to comprehensively evaluate the accuracy and applicability of seven typical deterministic development length models for deformed reinforcing bars (rebar) in normal and high-strength concrete. The influences of important factors (including compressive strength of concrete, concrete cover thickness, rebar diameter, tensile stress of reinforcement bar, residual tensile strength of cracked concrete, friction on bearing surface and effective bearing angle) on development length were investigated based on the partly cracked thick-walled cylinder model. Then a probabilistic development length model involving both aleatory and epistemic uncertainties was proposed based on the Bayesian theory and the Markov Chain Monte Carlo (MCMC) method. Meanwhile, key probabilistic characteristics of development length were presented and a probabilistic method was suggested to calibrate available deterministic development length models based on the confidence interval and the confidence level. Finally, the accuracy and applicability of available deterministic development length models under different conditions were calibrated comprehensively.
引用
收藏
页码:279 / 289
页数:11
相关论文
共 36 条
[1]  
[Anonymous], 2010, BD002
[2]  
[Anonymous], 2014, 318R14 ACI
[3]  
[Anonymous], 1990, THESIS
[4]  
[Anonymous], 2003, 408R03 ACI
[5]  
[Anonymous], 2010, GB 50010
[6]  
[Anonymous], 2002, EN 1990 EUR BAS STRU
[7]  
[Anonymous], 1993, 931 SL U KANS CTR RE
[8]  
Bernardo J M., 2008, Bayesian Theory
[9]   Design by testing procedure for intermediate debonding in EBR FRP strengthened RC beams [J].
Bilotta, A. ;
Faella, C. ;
Martinelli, E. ;
Nigro, E. .
ENGINEERING STRUCTURES, 2013, 46 :147-154
[10]  
Canadian Standard Association, 2014, DES CONCR STRUCT CSA