Two-machine flowshop scheduling with intermediate transportation under job physical space consideration

被引:20
|
作者
Gong, Hua [1 ,2 ]
Tang, Lixin [1 ]
机构
[1] Northeastern Univ, Liaoning Key Lab Mfg Syst & Logist, Logist Inst, Shenyang 110004, Peoples R China
[2] Shenyang Ligong Univ, Coll Sci, Shenyang 100159, Peoples R China
基金
中国国家自然科学基金;
关键词
Coordinated scheduling; Logistics; Flowshop; Worst-case analysis; DELIVERY COORDINATION; MACHINE;
D O I
10.1016/j.cor.2010.10.018
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper, we study a coordinated production-transportation scheduling problem in a two-machine flowshop environment where a single transporter may carry several jobs simultaneously as a batch between the machines. Each job has its own physical-space requirement while being loaded into the transporter. The goal is to minimize the makespan. For the jobs with the same size of physical space during transportation, we present a heuristic algorithm with an absolute worst-case ratio of 2 and a polynomial-time optimal algorithm for a special case with given job sequence. For the jobs having different size of physical storage space, a heuristic algorithm is constructed with an absolute worst-case ratio of 7/3 and asymptotic worst-case ratio of 20/9. Computational experiments demonstrate that the two heuristic algorithms developed are capable of generating near-optimal solutions quickly. (C) 2010 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1267 / 1274
页数:8
相关论文
共 50 条
  • [1] Two-machine flowshop scheduling in a physical examination center
    Wang, Yadong
    Fan, Baoqiang
    Zhai, Jingang
    Xiong, Wei
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2019, 37 (01) : 363 - 374
  • [2] Two-machine flowshop scheduling in a physical examination center
    Yadong Wang
    Baoqiang Fan
    Jingang Zhai
    Wei Xiong
    Journal of Combinatorial Optimization, 2019, 37 : 363 - 374
  • [3] Two-machine flowshop batching and scheduling
    Lin, BMT
    Cheng, TCE
    ANNALS OF OPERATIONS RESEARCH, 2005, 133 (1-4) : 149 - 161
  • [4] Two-Machine Flowshop Batching and Scheduling
    B. M. T. Lin
    T. C. E. Cheng
    Annals of Operations Research, 2005, 133 : 149 - 161
  • [5] Bicriteria scheduling in a two-machine permutation flowshop
    Lin, BMT
    Wu, JM
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2006, 44 (12) : 2299 - 2312
  • [6] Two-machine flowshop scheduling with a secondary criterion
    T'kindt, V
    Gupta, JND
    Billaut, JC
    COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (04) : 505 - 526
  • [7] Consideration of transportation lags in a two-machine Flow shop scheduling problem
    Jolai, F.
    Abedinnia, H.
    SCIENTIA IRANICA, 2013, 20 (06) : 2215 - 2223
  • [8] Scheduling of a two-machine flowshop with availability constraints on the first machine
    Allaoui, H
    Artiba, A
    Elmaghraby, SE
    Riane, F
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 99 (1-2) : 16 - 27
  • [9] Bicriteria Two-Machine Flowshop Scheduling using Metaheuristics
    Mansouri, S. Afshin
    Hendizadeh, S. Hamed
    Salmasi, Nasser
    GECCO 2007: GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, VOL 1 AND 2, 2007, : 909 - 909
  • [10] Two-machine flowshop scheduling with consecutive availability constraints
    Cheng, TCE
    Wang, GQ
    INFORMATION PROCESSING LETTERS, 1999, 71 (02) : 49 - 54