Rapid re-convergences to ambiguity-fixed solutions in precise point positioning

被引:174
作者
Geng, Jianghui [1 ]
Meng, Xiaolin [1 ]
Dodson, Alan H. [1 ]
Ge, Maorong [2 ]
Teferle, Felix N. [3 ]
机构
[1] Univ Nottingham, Inst Engn Surveying & Space Geodesy, Nottingham NG7 2TU, England
[2] GeoForschungsZentrum Helmholtz Ctr, D-14473 Potsdam, Germany
[3] Univ Luxemburg, Fac Sci Technol & Commun, Luxembourg, Luxembourg
关键词
Precise point positioning; Ambiguity resolution; Rapid re-convergence; Predicted ionospheric delays; CARRIER-PHASE AMBIGUITIES; DECORRELATION ADJUSTMENT; GPS; RESOLUTION;
D O I
10.1007/s00190-010-0404-4
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
Integer ambiguity resolution at a single receiver can be achieved if the fractional-cycle biases are separated from the ambiguity estimates in precise point positioning (PPP). Despite the improved positioning accuracy by such integer resolution, the convergence to an ambiguity-fixed solution normally requires a few tens of minutes. Even worse, these convergences can repeatedly occur on the occasion of loss of tracking locks for many satellites if an open sky-view is not constantly available, consequently totally destroying the practicability of real-time PPP. In this study, in case of such re-convergences, we develop a method in which ionospheric delays are precisely predicted to significantly accelerate the integer ambiguity resolution. The effectiveness of this method consists in two aspects: first, wide-lane ambiguities can be rapidly resolved using the ionosphere-corrected wide-lane measurements, instead of the noisy Melbourne-Wubbena combination measurements; second, narrow-lane ambiguity resolution can be accelerated under the tight constraints derived from the ionosphere-corrected unambiguous wide-lane measurements. In the test at 90 static stations suffering from simulated total loss of tracking locks, 93.3 and 95.0% of re-convergences to wide-lane and narrow-lane ambiguity resolutions can be achieved within five epochs of 1-Hz measurements, respectively, even though the time latency for the predicted ionospheric delays is up to 180 s. In the test at a mobile van moving in a GPS-adverse environment where satellite number significantly decreases and cycle slips frequently occur, only when the predicted ionospheric delays are applied can the rate of ambiguity-fixed epochs be dramatically improved from 7.7 to 93.6% of all epochs. Therefore, this method can potentially relieve the unrealistic requirement of a continuous open sky-view by most PPP applications and improve the practicability of real-time PPP.
引用
收藏
页码:705 / 714
页数:10
相关论文
共 35 条
  • [1] [Anonymous], 2008, P ION GNSS 2008 I NA
  • [2] Banville S, 2009, P ION GNSS 2009 I NA, P2470
  • [3] Specification and forecasting of scintillations in communication/navigation links: current status and future plans
    Basu, S
    Groves, KM
    Basu, S
    Sultan, PJ
    [J]. JOURNAL OF ATMOSPHERIC AND SOLAR-TERRESTRIAL PHYSICS, 2002, 64 (16) : 1745 - 1754
  • [4] Current State of Precise Point Positioning and Future Prospects and Limitations
    Bisnath, S.
    Gao, Y.
    [J]. OBSERVING OUR CHANGING EARTH, 2009, 133 : 615 - +
  • [5] Bruyninx C., 2004, Geoinformatics, V7, P32
  • [6] Predicting atmospheric biases for real-time ambiguity resolution in GPS/GLONASS reference station networks
    Dai, L
    Wang, J
    Rizos, C
    Han, S
    [J]. JOURNAL OF GEODESY, 2003, 76 (11-12) : 617 - 628
  • [7] The International GNSS Service in a changing landscape of Global Navigation Satellite Systems
    Dow, John M.
    Neilan, R. E.
    Rizos, C.
    [J]. JOURNAL OF GEODESY, 2009, 83 (3-4) : 191 - 198
  • [8] Ge M, 2008, J GEODESY, V82, P389, DOI [10.1007/s00190-007-0208-3, 10.1007/s00190-007-0187-4]
  • [9] Towards PPP-RTK: Ambiguity resolution in real-time precise point positioning
    Geng, J.
    Teferle, F. N.
    Meng, X.
    Dodson, A. H.
    [J]. ADVANCES IN SPACE RESEARCH, 2011, 47 (10) : 1664 - 1673
  • [10] Geng JH, 2009, I NAVIG SAT DIV INT, P2437