Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction

被引:183
作者
Li, Clyde Zhengdao [1 ]
Zhong, Ray Y. [2 ]
Xue, Fan [3 ]
Xu, Gangyan [2 ]
Chen, Ke [4 ]
Huang, George Guoquan [2 ]
Shen, Geoffrey Qiping [5 ]
机构
[1] Shenzhen Univ, Coll Civil Engn, Shenzhen, Peoples R China
[2] Univ Hong Kong, Dept Ind & Mfg Syst Engn, HKU ZIRI Lab Phys Internet, Pokfulam, Hong Kong, Peoples R China
[3] Univ Hong Kong, Fac Architecture, Dept Real Estate & Construct, Hong Kong, Hong Kong, Peoples R China
[4] Univ Hong Kong, Dept Real Estate & Construct, Hong Kong, Hong Kong, Peoples R China
[5] Hong Kong Polytech Univ, Fac Construct & Environm, Dept Bldg & Real Estate, Construct Management, Hong Kong, Hong Kong, Peoples R China
关键词
RFID; BIM; Schedule performance; Schedule risk; Prefabricated house construction; Hong Kong; HONG-KONG; INTERNET; MODEL; CHINA;
D O I
10.1016/j.jclepro.2017.07.156
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
With its generally recognized benefits of clean and safe working environment and good quality, prefabricated house construction (PHC) as a solution is gaining momentum in the face of various housing challenges in Hong Kong's construction industry. Although prefabrication has its own benefits, its fundamental disadvantages of fragmentation, discontinuity, poor interoperability, and scarce real-time information availability have imposed significant adverse influence on the schedule performance of prefabricated house construction. As a result, despite the promise of the government to provide sufficient houses and harmonious housing, schedule delay problems still frequently beset the industry of PHC. To help address schedule delay problems encountered in the construction of prefabrication housing, this research first identified and analysed critical schedule risk factors that may have significant influence on the schedule performance of PHC. Based on the identified schedule risks, the challenges and corresponding required functions for enhancing schedule performance are determined. Then, a radio frequency identification device (RFID)-enabled BIM platform that integrates various involved stakeholders, information/data flow, offshore prefabrication procedures, and state-of-the-art construction technologies, is developed to handle the critical schedule factors. Smart construction objects and RFID-enabled smart gateway work collaboratively to ease operations within the three echelons of prefabrication manufacturing, logistics and on-site assembly construction, while real-time captured data are used to form a closed-loop visibility and traceability mode in which different end users can supervise the construction statuses, progresses in real time. The developed platform can provide various services, tools and mechanisms to different stakeholders, improve the success of daily operations and decision makings throughout PHC management, such that critical schedule risks can be mitigated and the schedule performance of PHC can be enhanced to ensure timely project delivery. (C) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:1048 / 1062
页数:15
相关论文
共 19 条
  • [1] [Anonymous], 2015, HONG KONG ANN DIG ST
  • [2] Barlas Y, 1996, SYST DYNAM REV, V12, P183, DOI 10.1002/(SICI)1099-1727(199623)12:3<183::AID-SDR103>3.0.CO
  • [3] 2-4
  • [4] Barlas Y., 2000, 18 INT C SYST DYN SO
  • [5] Hong J., 2015, J CLEAN PROD
  • [6] Life-cycle energy analysis of prefabricated building components: an input-output-based hybrid model
    Hong, Jingke
    Shen, Geoffrey Qiping
    Mao, Chao
    Li, Zhengdao
    Li, Kaijian
    [J]. JOURNAL OF CLEANER PRODUCTION, 2016, 112 : 2198 - 2207
  • [7] Hong Kong Housing Authority, 2016, FOR PUBL HOUS PROD
  • [8] Schedule risk modeling in prefabrication housing production
    Li, Clyde Zhengdao
    Shen, Geoffrey Qiping
    Xu, Xiaoxiao
    Xue, Fan
    Sommer, Lucila
    Luo, Lizi
    [J]. JOURNAL OF CLEANER PRODUCTION, 2017, 153 (01) : 692 - 706
  • [9] SWOT analysis and Internet of Things-enabled platform for prefabrication housing production in Hong Kong
    Li, Clyde Zhengdao
    Hong, Jingke
    Xue, Fan
    Shen, Geoffrey Qiping
    Xu, Xiaoxiao
    Luo, Lizi
    [J]. HABITAT INTERNATIONAL, 2016, 57 : 74 - 87
  • [10] Schedule risks in prefabrication housing production in Hong Kong: a social network analysis
    Li, Clyde Zhengdao
    Hong, Jingke
    Xue, Fan
    Shen, Geoffrey Qiping
    Xu, Xiaoxiao
    Mok, Margaret Kayan
    [J]. JOURNAL OF CLEANER PRODUCTION, 2016, 134 : 482 - 494