Using the Explicit Dynamic Method to Simulate Pile Dynamical Driving Process

被引:0
|
作者
Lv, Jianbing [1 ,2 ]
Fu, Helin [1 ]
Li, Huazhi [3 ]
Liu, Zhe [4 ]
机构
[1] Cent S Univ, Sch Civil Engn & Architecture, Changsha 710054, Hunan, Peoples R China
[2] Guangdong Hualu Transportat & Commun Technol Ltd, Guangzhou 510420, Guangdong, Peoples R China
[3] Xian Aerotech Coll, Sch Dynam Engn, Xian 710077, Peoples R China
[4] S W Jiaotong Univ, Chengdu 610031, Peoples R China
来源
ADVANCES IN STRUCTURES, PTS 1-5 | 2011年 / 163-167卷
关键词
Pile Driving Process; Explicit Dynamic Method; Stress Wave;
D O I
10.4028/www.scientific.net/AMR.163-167.366
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The dynamic pile driving process is so complex that till now the analysis on the process had been focusing on the filed test or laboratory test. However, the past study about the dynamic process is a time consuming one; with the computational method development, the numerical simulation on this process is possible. In this paper, explicit dynamical analysis method is adopted, the pile is simulated using the elastic solid element, two computational cases are considered and finally the pile driving process dynamical stress is studied. Huazhi Li, School of dynamical engineering, Xi'an Aerotechnical college
引用
收藏
页码:366 / +
页数:2
相关论文
共 50 条
  • [1] Dynamic simulation of a vibratory pile driving process
    Li, Xiao-Peng
    Duan, Ze-Liang
    Li, Tao
    Wen, Bang-Chun
    Zhendong yu Chongji/Journal of Vibration and Shock, 2012, 31 (07): : 24 - 26
  • [2] Dynamic Simulation of the Pile-soil Interaction in the Vibratory Pile Driving Process
    Li, Xiaopeng
    Duan, Zeliang
    Li, Tao
    Wen, Bangchun
    ADVANCED BUILDING MATERIALS, PTS 1-4, 2011, 250-253 (1-4): : 980 - 983
  • [3] SIMPLIFIED DYNAMIC METHOD FOR PILE-DRIVING CONTROL
    LIANG, RY
    HUSEIN, AI
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1993, 119 (04): : 694 - 713
  • [4] Dynamic pile response using two pile-driving techniques
    Benamar, A
    SOIL DYNAMICS AND EARTHQUAKE ENGINEERING, 2000, 20 (1-4) : 243 - 247
  • [5] Probability method applied to dynamic pile-driving control
    Liang, RY
    Zhou, J
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 1997, 123 (02) : 137 - 144
  • [6] SIMPLIFIED DYNAMIC METHOD FOR PILE-DRIVING CONTROL - DISCUSSION
    KUO, CL
    JOURNAL OF GEOTECHNICAL ENGINEERING-ASCE, 1994, 120 (10): : 1906 - 1908
  • [7] Study on non-linear dynamical characteristic of pile-soil system for vibratory pile driving process
    Li Xiaopeng
    Ren Zhaohui
    Song Naihui
    Wen Bangchun
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON MECHANICAL TRANSMISSIONS, VOLS 1 AND 2, 2006, : 1213 - 1217
  • [8] A method to simulate multilayer welding process: Node dynamic relaxation method
    State Key Laboratory of Advanced Welding Production Technology, Harbin Institute of Technology, Harbin 150001, China
    不详
    China Weld Eng Ed, 2009, 3 (42-45):
  • [9] Probability method applied to dynamic pile-driving control - Closure
    Liang, RY
    Zhou, JA
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 1998, 124 (12) : 1221 - 1221
  • [10] Probability method applied to dynamic pile-driving control - Discussion
    Svinkin, MR
    JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 1998, 124 (12) : 1220 - 1221