Intermittency-friendly and high-efficiency cogeneration: Operational optimisation of cogeneration with compression heat pump, flue gas heat recovery, and intermediate cold storage

被引:53
|
作者
Blarke, Morten B. [1 ]
Dotzauer, Erik [2 ]
机构
[1] Aalborg Univ, Dept Energy Technol, DK-9220 Aalborg, Denmark
[2] Malardalen Univ, SE-72123 Vasteras, Sweden
关键词
Intermittent renewables; Cogeneration; Compression heat pumps; Cold storage; LP/MILP operational optimisation; RENEWABLE ENERGY-SYSTEMS; LARGE-SCALE INTEGRATION; WIND POWER; GENERATION; MARKET; CHP; STRATEGIES; PRICES; PLANTS;
D O I
10.1016/j.energy.2011.10.008
中图分类号
O414.1 [热力学];
学科分类号
摘要
This paper develops, implements, and applies a mathematical model for economic unit dispatch for a novel cogeneration concept (CHP-HP-FG-CS (CHP with compression heat pump and cold storage using flue gas heat)) that increases the plant's operational flexibility. The CHP-HP-FG-CS concept is a high-efficiency and widely applicable option in distributed cogeneration better supporting the co-existence between cogenerators and intermittent renewables in the energy system. The concept involves integrating an efficient high-temperature compression heat pump that uses only waste heat recovered from flue gases as low-temperature heat source, and an intermediate cold thermal storage allowing for non-concurrent operation of the cogeneration unit and the heat pump unit. The model is applied for a paradigmatic case study that shows how the integration of a heat pump affects the operational strategy of a cogeneration plant. It is found that CHP-HP-FG-CS offers significant reductions in fuel consumption (-8.9%) and operational production costs (-11.4%). The plant's fuel-to-energy efficiency increases from 88.9 to 95.5%, which is state-of-the-art. The plant's intermittency-friendliness coefficient Rc improves only marginally due to the constrained nature of the low-temperature heat source and the associated small capacity of the heat pump unit. Significant improvements in Rc are found when increasing the heat pump capacity assuming the availability of an unconstrained heat source. (C) 2011 Elsevier Ltd. All rights reserved.
引用
收藏
页码:6867 / 6878
页数:12
相关论文
共 4 条
  • [1] Development of the high-efficiency heat pump - Two-stage compression system for the cold area
    Yamamura, S.
    Zhong, M.
    CRYOGENICS AND REFRIGERATION, PROCEEDINGS, 2008, : 52 - 58
  • [2] Simulation study of an open compression absorption heat pump in water and heat recovery of low-temperature and high-humidity flue gas
    Wang, Xiaozhe
    Zhang, Hao
    Cui, Lin
    Wang, Jingying
    Lee, Chunhian
    Dong, Yong
    ENERGY CONVERSION AND MANAGEMENT, 2022, 269
  • [3] Simulation study of an open compression absorption heat pump in water and heat recovery of low-temperature and high-humidity flue gas
    Wang, Xiaozhe
    Zhang, Hao
    Cui, Lin
    Wang, Jingying
    Lee, Chunhian
    Dong, Yong
    Energy Conversion and Management, 2022, 269
  • [4] Operation strategy and performance investigation of a high-efficiency multifunctional two-stage vapor compression heat pump air conditioning system for electric vehicles in severe cold regions
    Ning, Qian
    He, Guogeng
    Xiong, Guohui
    Sun, Wei
    Song, Hai
    SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2021, 48