An Optimization Model for Balancing Assembly Lines With Stochastic Task Times and Zoning Constraints

被引:19
作者
Fathi, Masood [1 ]
Nourmohammadi, Amir [1 ]
Ng, Amos H. C. [1 ]
Syberfeldt, Anna [1 ]
机构
[1] Univ Skovde, Dept Prod & Automat Engn, S-54128 Skovde, Sweden
基金
欧盟地平线“2020”;
关键词
Assembly line balancing; mathematical programming; stochastic; zoning constraints; EVOLUTIONARY ALGORITHM;
D O I
10.1109/ACCESS.2019.2903738
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper aims to bridge the gap between theory and practice by addressing a real-world assembly line balancing problem (ALBP), where task times are stochastic and there are zoning constraints in addition to the commonly known ALBP constraints. A mixed integer programming (MIP) model is proposed for each of the straight and U-shaped assembly line configurations. The primary objective in both cases is to minimize the number of stations; minimizing the maximum of stations' meantime; and the stations' time variance is considered as secondary objectives. Four different scenarios are discussed for each model, with differences in the objective function. The models are validated by solving a real case taken from an automobile manufacturing company and some standard test problems available in this paper. The results indicate that both models are able to provide optimum solutions for problems of different sizes. The technique for order preference by similarity to ideal solution (TOPSIS) is used to create reliable comparisons of the different scenarios and valid analysis of the results. Finally, some insights regarding the selection of straight and U-shaped layouts are provided.
引用
收藏
页码:32537 / 32550
页数:14
相关论文
共 56 条
[1]   A chance-constrained approach to stochastic line balancing problem [J].
Agpak, Kursad ;
Gokcen, Hadi .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (03) :1098-1115
[2]   Mathematical models for parallel two-sided assembly line balancing problems and extensions [J].
Agpak, Kursad ;
Zolfaghari, Saeed .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (04) :1242-1254
[3]  
[Anonymous], 1981, MULTIPLE ATTRIBUTE D
[4]   Balancing stochastic U-lines using particle swarm optimization [J].
Aydogan, Emel Kizilkaya ;
Delice, Yilmaz ;
Ozcan, Ugur ;
Gencer, Cevriye ;
Bali, Ozkan .
JOURNAL OF INTELLIGENT MANUFACTURING, 2019, 30 (01) :97-111
[5]   Balancing of stochastic U-type assembly lines: an imperialist competitive algorithm [J].
Bagher, M. ;
Zandieh, M. ;
Farsijani, H. .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 54 (1-4) :271-285
[6]   A taxonomy of line balancing problems and their solution approaches [J].
Battaia, Olga ;
Dolgui, Alexandre .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 142 (02) :259-277
[7]   Models for assembly line balancing by temporal, spatial and ergonomic risk attributes [J].
Bautista, Joaquin ;
Batalla-Garcia, Cristina ;
Alfaro-Pozo, Rocio .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 251 (03) :814-829
[8]   Multi-rule multi-objective simulated annealing algorithm for straight and U type assembly line balancing problems [J].
Baykasoglu, A .
JOURNAL OF INTELLIGENT MANUFACTURING, 2006, 17 (02) :217-232
[9]   Stochastic U-line balancing using genetic algorithms [J].
Baykasoglu, Adil ;
Ozbakir, Lale .
INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2007, 32 (1-2) :139-147
[10]  
Baykasoglu A, 2009, MATH COMPUT APPL, V14, P1