Scheduling batches with simultaneous job processing for two-machine shop problems

被引:0
作者
Potts, CN [1 ]
Strusevich, VA
Tautenhahn, T
机构
[1] Univ Southampton, Fac Math Studies, Southampton SO17 1BJ, Hants, England
[2] Univ Greenwich, Sch Comp & Math Sci, London SE10 9LS, England
[3] Otto Von Guericke Univ, Fak Math, D-39016 Magdeburg, Germany
关键词
scheduling; batching; polynomial algorithm; NP-hard; open shop; job shop; flow shop;
D O I
10.1002/1099-1425(200101/02)4:1<25::AID-JOS58>3.0.CO;2-7
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the problem of scheduling independent jobs on two machines in an open shop, a job shop and a flow shop environment. Both machines are batching machines, which means that several operations can be combined into a batch and processed simultaneously on a machine. The batch processing time is the maximum processing time of operations in the batch, and all operations in a batch complete at the same time. Such a situation may occur, for instance, during the final testing stage of circuit board manufacturing, where burn-in operations are performed in ovens. We consider cases in which there is no restriction on the size of a batch on a machine, and in which a machine can process only a bounded number of operations in one batch. For most of the possible combinations of restrictions, we establish the complexity status of the problem. Copyright (C) 2001 John Wiley & Sons, Ltd.
引用
收藏
页码:25 / 51
页数:27
相关论文
共 24 条
  • [1] AHMADI JH, 1992, OPER RES, V39, P750
  • [2] THE COMPLEXITY OF ONE-MACHINE BATCHING PROBLEMS
    ALBERS, S
    BRUCKER, P
    [J]. DISCRETE APPLIED MATHEMATICS, 1993, 47 (02) : 87 - 107
  • [3] Brucker P., 1998, Journal of Scheduling, V1, P31, DOI 10.1002/(SICI)1099-1425(199806)1:1<31::AID-JOS4>3.0.CO
  • [4] 2-R
  • [5] BRUCKER P, 1996, MATH METHOD OPER RES, V43, P1
  • [6] MINIMIZING TOTAL COMPLETION-TIME ON A BATCH PROCESSING MACHINE WITH JOB FAMILIES
    CHANDRU, V
    LEE, CY
    UZSOY, R
    [J]. OPERATIONS RESEARCH LETTERS, 1993, 13 (02) : 61 - 65
  • [7] MINIMIZING TOTAL COMPLETION-TIME ON BATCH PROCESSING MACHINES
    CHANDRU, V
    LEE, CY
    UZSOY, R
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1993, 31 (09) : 2097 - 2121
  • [8] CHENG TCE, 1998, UNPUB SINGLE MACHINE
  • [9] CHENG TCE, 1995, WORKING PAPER I ENG
  • [10] Coffman E. G. Jr., 1990, Annals of Operations Research, V26, P135, DOI 10.1007/BF02248589