An operational model of a reservoir system simulation for real-time flood control in the Han River Basin

被引:4
作者
Lee, S. [1 ]
Kang, T. [2 ]
Lee, K. S. [3 ]
机构
[1] Pukyong Natl Univ, Civil Engn, Busan, South Korea
[2] Korea Water Resources Corp, K Water Res Inst, 125 Yuseong Daero 1689 Beon Gil, Daejeon 305730, South Korea
[3] Seoul Natl Univ, Civil & Environm Engn, Seoul, South Korea
来源
JOURNAL OF FLOOD RISK MANAGEMENT | 2017年 / 10卷 / 04期
关键词
Channel capacity; real-time flood control; reservoir balance; reservoir system; MANAGEMENT; ALGORITHM;
D O I
10.1111/jfr3.12159
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
An operational model of a reservoir system simulation was developed for real-time flood control in the Han River Basin, Korea. The developed simulation model jointly operates the four flood control dams. The reservoir system operation model decides or alters a control point and the target river for flood control according to the dam state defined by the two levels of the dam: the maximum forecasted reservoir level and the restricted water level in the flood season. In addition, the model switches the release objectives corresponding to the flood stages, which are normal hydropower release, maximum hydropower release, and spillway release. The reservoir system operation model determines flood releases by reflecting two major concepts: the model pursues reservoir balance at the end of a joint operation and the channel capacity on a downstream control point may limit the release amount from an upstream dam. The application of the model to two historical flood events showed that the channel capacity may limit dam releases and thus may contribute to the reduction of peak discharge on the downstream control point. The model has been operationally used for flood control in the Han River Basin.
引用
收藏
页码:499 / 510
页数:12
相关论文
共 25 条
  • [11] Derived operating rules for reservoirs in series or in parallel
    Lund, JR
    Guzman, J
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1999, 125 (03): : 143 - 153
  • [12] A real-time operation optimization model for flood management in river-reservoir systems
    Malekmohammadi, Bahram
    Zahraie, Banafsheh
    Kerachian, Reza
    [J]. NATURAL HAZARDS, 2010, 53 (03) : 459 - 482
  • [13] Linear programming for flood control in the Iowa and Des Moines rivers
    Needham, JT
    Watkins, DW
    Lund, JR
    Nanda, SK
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 2000, 126 (03): : 118 - 127
  • [14] Limitations of deterministic optimization applied to reservoir operations
    Philbrick, CR
    Kitanidis, PK
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 1999, 125 (03) : 135 - 142
  • [15] Optimal reservoir operation using multi-objective evolutionary algorithm
    Reddy, M. Janga
    Kumar, D. Nagesh
    [J]. WATER RESOURCES MANAGEMENT, 2006, 20 (06) : 861 - 878
  • [16] Reservoir operating rules with fuzzy programming
    Russell, SO
    Campbell, PF
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT-ASCE, 1996, 122 (03): : 165 - 170
  • [17] Spatial decision support system for integrated river basin flood control
    Shim, KC
    Fontane, DG
    Labadie, JW
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2002, 128 (03) : 190 - 201
  • [18] Tennessee Valley Authority, 1974, TECHNICAL REPORT
  • [19] Unver O.L., 1990, Water Resources Management, V4, P21, DOI [10.1007/BF00429923, DOI 10.1007/BF00429923]
  • [20] USACE, 1998, HEC 5 SIM FLOOD CONT