Research on Capacity Measurement Method of Horizontal Cylindrical Tank Based on Monte Carlo Method

被引:1
|
作者
Chen, Guoyu [1 ]
Hu, Houlin [1 ]
Lin, Huanhuan [1 ]
Chen, Liling [1 ]
Wan, Yong [1 ]
Xiao, Tiange [2 ]
Peng, Yanhua [3 ]
机构
[1] Guangzhou Inst Energy Testing, Res & Dev Dept, Guangzhou, Peoples R China
[2] South China Univ Technol, Sch Mech & Automot Engn, Guangzhou, Peoples R China
[3] Guilin Univ Elect Technol, Sch Mech & Elect Engn, Guilin, Peoples R China
基金
中国国家自然科学基金;
关键词
horizontal cylindrical tank; capacity; Monte-Carlo method; error compensation;
D O I
10.1007/s10553-022-01354-y
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A horizontal cylindrical tank is a common storage device for petroleum products, and its capacity table is an important basis for calculating the volume of liquid poured into and out of the tank. In this study, a method for measuring the capacity of horizontal cylindrical tanks is proposed, focusing on the problems of large workload and time consumption of existing measurement methods. The method is based on the Monte-Carlo algorithm. The capacity table is calculated by arranging the sensor points on the inner wall of the tank, and then counting the number of sample points that fall in the horizontal cylindrical tank according to the coordinates of the sensor point, the distance from the sensor point to the origin, and other parameters. It was found, that the relationship between the relative error of the measured result and the height of the liquid level conforms to the exponential function. Based on this relationship, the error compensation algorithm is established, which can help to reduce the absolute error and relative error of the measurement result.
引用
收藏
页码:84 / 89
页数:6
相关论文
共 50 条
  • [21] Evaluation of measurement uncertainties for five-hole probes based on Monte Carlo method
    Ma H.
    Li X.
    Zhao G.
    Hangkong Dongli Xuebao/Journal of Aerospace Power, 2022, 37 (11): : 2587 - 2597
  • [22] Geometric error measurement uncertainty analysis of rotary axis based on Monte Carlo method
    Sun, Jianghao
    Xiang, Sitong
    Yu, Ben
    Chen, Maolei
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART C-JOURNAL OF MECHANICAL ENGINEERING SCIENCE, 2023, 237 (22) : 5312 - 5329
  • [23] On a Monte Carlo method for measurement uncertainty evaluation and its implementation
    Harris, P. M.
    Cox, M. G.
    METROLOGIA, 2014, 51 (04) : S176 - S182
  • [24] Numerical investigation of measurement error of the integrating sphere based on the Monte-Carlo method
    Liu, Bin
    Yuan, Yuan
    Yu, Zhao-Yang
    Huang, Xing
    Tan, He-Ping
    INFRARED PHYSICS & TECHNOLOGY, 2016, 79 : 121 - 127
  • [25] Evaluation of measurement uncertainty in H-drive stage during high acceleration based on Monte Carlo method
    Liu, Yongmeng
    Yuan, Maoqiang
    Cao, Jieru
    Cui, Jiwen
    Tan, Jiubin
    INTERNATIONAL JOURNAL OF MACHINE TOOLS & MANUFACTURE, 2015, 93 : 1 - 9
  • [26] Software testing technology research based on Monte Carlo method and classical probability model
    Zhang Zhonglin
    Hu Yuehua
    Xu Xiaomei
    Ma Haiyun
    ICCSE'2006: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE & EDUCATION: ADVANCED COMPUTER TECHNOLOGY, NEW EDUCATION, 2006, : 872 - 874
  • [27] Research on the microstructure and transmission characteristics of magnetic fluids film based on the Monte Carlo method
    Lv, Ri-qing
    Zhao, Yong
    Xu, Ning
    Li, Hao
    JOURNAL OF MAGNETISM AND MAGNETIC MATERIALS, 2013, 337 : 23 - 28
  • [28] A new Monte Carlo-based fitting method
    Pedroni, P.
    Sconfietti, S.
    JOURNAL OF PHYSICS G-NUCLEAR AND PARTICLE PHYSICS, 2020, 47 (05)
  • [29] Blackbody radiation simulated based on Monte carlo method
    Science and Technology on Electronic Test and Measurement Laboratory, The 41st Institute of China Electronics Technology Group Corporation, Qingdao
    Shandong
    266555, China
    Guangxue Xuebao,
  • [30] The Project Time Analytical Method Based on Monte Carlo
    Zhang, Chuan-ming
    Wang, Zu-he
    NINTH CHINA PROJECT MANAGEMENT CONFERENCE, 2010, : 256 - 259