Joint Optimization of Forward Contract and Operating Rules for Cascade Hydropower Reservoirs

被引:8
|
作者
Li, Xiao [1 ]
Liu, Pan [1 ]
Ming, Bo [2 ]
Huang, Kangdi [1 ]
Xu, Weifeng [1 ]
Wen, Yan [3 ]
机构
[1] Wuhan Univ, State Key Lab Water Resources & Hydropower Engn S, Wuhan 430072, Peoples R China
[2] Xian Univ Technol, State Key Lab Ecohydraul Northwest Arid Reg, Xian 710048, Peoples R China
[3] Hubei Qingjiang Hydropower Dev Co Ltd, Dongshan Ave, Yichang 443000, Peoples R China
基金
中国国家自然科学基金;
关键词
Hydropower contract; Operating rules; Cascade reservoirs; Electricity market; Deterministic operation; GENETIC ALGORITHM; RISK-MANAGEMENT; GENERATION; SYSTEMS; DERIVATION; MODEL; WATER; PRICE;
D O I
10.1061/(ASCE)WR.1943-5452.0001510
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Forward contract is a useful tool for hydropower producers to hedge revenue uncertainty sourced from varied spot prices. However, few studies have been explored to jointly derive the optimal forward contract and operating rules to guide hydropower operations. To address this issue, the following steps for cascade reservoirs are proposed: (1) a two-layer nested approach is used to derive optimal contract targets coordinated with operation trajectory (saying reservoir water level time series) by inputting deterministic inflows, (2) the forms of the operating rules are then identified based on the optimal operation trajectory from the first step, and (3) a simulation-based optimization approach is used to jointly refine the optimal contract and operating rules with the forms identified in the second step. With China's Hubei Province as the market boundary, the Qing River cascade reservoir system was selected as the case study. The results show that (1) the two-layer nested approach could find the optimal deterministic operation together with contract targets; (2) the total cascade output is related to both available energy and spot price, with the coefficients of determination for each month mostly greater than 0.5; and (3) the refined operating rules and contract effectively improved the annual hydropower revenue by 3.65% ($14.15 million) compared to that of the conventional operating rules. The proposed method to jointly derive forward contract and operating rules is helpful for gaining more revenue under long-term hydropower operations.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] Optimization of hedging rules for hydropower reservoir operation
    Sasireka, K.
    Neelakantan, T. R.
    SCIENTIA IRANICA, 2017, 24 (05) : 2242 - 2252
  • [32] Simplex quantum-behaved particle swarm optimization algorithm with application to ecological operation of cascade hydropower reservoirs
    Xia, Yan
    Feng, Zhong-kai
    Niu, Wen-jing
    Qin, Hui
    Jiang, Zhi-qiang
    Zhou, Jian-zhong
    APPLIED SOFT COMPUTING, 2019, 84
  • [33] Effect of the quality of streamflow forecasts on the operation of cascade hydropower stations using stochastic optimization models
    Liu, Yuan
    Ji, Changming
    Wang, Yi
    Zhang, Yanke
    Jiang, Zhiqiang
    Ma, Qiumei
    Hou, Xiaoning
    ENERGY, 2023, 273
  • [34] Multi-stage progressive optimality algorithm and its application in energy storage operation chart optimization of cascade reservoirs
    Jiang, Zhiqiang
    Ji, Changming
    Qin, Hui
    Feng, Zhongkai
    ENERGY, 2018, 148 : 309 - 323
  • [35] Two Dimension Reduction Methods for Multi-Dimensional Dynamic Programming and Its Application in Cascade Reservoirs Operation Optimization
    Jiang, Zhiqiang
    Qin, Hui
    Ji, Changming
    Feng, Zhongkai
    Zhou, Jianzhong
    WATER, 2017, 9 (09)
  • [36] Optimizing complementary operation of mega cascade reservoirs for boosting hydropower sustainability
    Zhu, Yuxin
    Zhou, Yanlai
    Xu, Chong -Yu
    Chang, Fi-John
    SUSTAINABLE ENERGY TECHNOLOGIES AND ASSESSMENTS, 2024, 64
  • [37] A Practical Short-term Scheduling Model for Cascade Hydropower Reservoirs
    Feng, Yu
    Zhong, Jian
    Lu, Peng
    FRONTIERS OF MANUFACTURING SCIENCE AND MEASURING TECHNOLOGY V, 2015, : 1269 - 1276
  • [38] Joint flood control scheduling strategy of large cascade reservoirs: A case study of the cascade reservoirs in the upper reaches of the Yangtze River in China
    Jing, Zhu
    Zhang, Rongqi
    Bao, Hexin
    Zhang, Shanghong
    JOURNAL OF FLOOD RISK MANAGEMENT, 2022,
  • [39] Parameter uncertainty analysis of reservoir operating rules based on implicit stochastic optimization
    Liu, Pan
    Li, Liping
    Chen, Gaojie
    Rheinheimer, David E.
    JOURNAL OF HYDROLOGY, 2014, 514 : 102 - 113
  • [40] A Triple-stage Operation Method for Deriving Operation Rules for Cascade Reservoirs during Catastrophic Flood Events
    Zhu, Di
    Chen, Hua
    Zhou, Yanlai
    Mei, Yadong
    Xu, Xinfa
    Guo, Shenglian
    WATER RESOURCES MANAGEMENT, 2022, 36 (13) : 4863 - 4883