On scheduling with non-increasing time slot cost to minimize total weighted completion time

被引:7
作者
Zhao, Yingchao [1 ]
Qi, Xiangtong [2 ]
Li, Minming [3 ]
机构
[1] Caritas Inst Higher Educ, Tseung Kwan O, Hong Kong, Peoples R China
[2] Hong Kong Univ Sci & Technol, Hong Kong, Hong Kong, Peoples R China
[3] City Univ Hong Kong, Kowloon, Hong Kong, Peoples R China
关键词
Operations research; Scheduling; Time slot cost; Total weighted completion time;
D O I
10.1007/s10951-015-0462-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper addresses a recent open scheduling problem which aims to minimize the summation of total weighted completion time and the total machine time slot cost. Focusing on the case of non-increasing time slot cost with non-preemptive jobs, we show that the problem can be solved in polynomial-time when the time slot cost decreases with certain patterns, including linearly decreasing, decreasing concave, and decreasing convex cases. Different methodologies are used for three cases. For the linearly decreasing case, we can classify all the jobs into three categories and schedule the job sets one by one. For the decreasing concave case, we calculate each job's worst starting time and try to make them far away from their worst starting times. For the decreasing concave case, we calculate each job's best starting time and let them start close to their best starting times. Finally, we show that the problem is NP-hard in the strong sense when the time slot cost decreases in an arbitrary way.
引用
收藏
页码:759 / 767
页数:9
相关论文
共 7 条
[1]   Coordination of Outsourced Operations to Minimize Weighted Flow Time and Capacity Booking Costs [J].
Aydinliyim, Tolga ;
Vairaktarakis, George L. .
M&SOM-MANUFACTURING & SERVICE OPERATIONS MANAGEMENT, 2010, 12 (02) :236-255
[2]  
Chen L., 2015, MFCS 2015
[3]   STRONG NP-COMPLETENESS RESULTS - MOTIVATION, EXAMPLES, AND IMPLICATIONS [J].
GAREY, MR ;
JOHNSON, DS .
JOURNAL OF THE ACM, 1978, 25 (03) :499-508
[4]  
Kulkarni J., 2012, P 10 INT WORKSH APPR, P201
[5]  
Liu X., 2012, RECENT ADV COMPUTER
[6]  
Pinedo ML, 2012, SCHEDULING: THEORY, ALGORITHMS, AND SYSTEMS, FOURTH EDITION, P1, DOI 10.1007/978-1-4614-2361-4
[7]   Scheduling with Variable Time Slot Costs [J].
Wan, Guohua ;
Qi, Xiangtong .
NAVAL RESEARCH LOGISTICS, 2010, 57 (02) :159-171