Correlation of tunnel convergence with TBM operational parameters and chip size in the Ghomroud tunnel, Iran

被引:73
作者
Farrokh, Ebrahim [2 ]
Rostami, Jamal [1 ]
机构
[1] Penn State Univ, Dept Energy & Min Engn, University Pk, PA 16802 USA
[2] Sahel Consulting Co, Tehran, Iran
关键词
tunneling; excavation; tunnel boring machine; double shield TBM; rock mass characterization; tunnel convergence;
D O I
10.1016/j.tust.2008.01.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Evaluating the impact of rock mass properties on a tunneling optical is crucial, especially when using a tunnel boring machine (TBM). It is an integral part of machine selection and performance prediction ill the design and bidding stage. Monitoring and analysis of ground conditions during the construction is also essential to allow the operator to take precautionary measures in adverse geological conditions. This involves adjusting TBM operational parameters such as machine thrust and penetration to avoid potential problems caused by face collapse or excessive convergence and subsequent machine seizure that can Cause long delays. Tunnel wall convergence is a function of rock mass characteristics. in situ stresses. size of excavation. and rate of penetration (ROP). It is one of the main factors ill determining the use of shielded machines in deep rock tunnel projects. The case study of the Ghomroud water conveyance tunnel project, under construction by a double shield TBM, is used to examine the effect of rock mass parameters on tunnel convergence and hence on the need for over excavation and shield lubrication to avoid problems such as shield seizure. Results of a preliminary analysis of field observations show that the amount of the tunnel convergence call have a direct relationship with the percentage of powder and large rock fragments in the muck. In addition, tunnel convergence has shown a strong relationship with the TBM thrust/torque and rate of penetration (ROP). These relationships have been examined and the results Of the analysis as well as the resulting formulas will be explained in this paper. (C) 2008 Elsevier Ltd. All rights reserved.
引用
收藏
页码:700 / 710
页数:11
相关论文
共 8 条
  • [1] Bruland A, 1998, 1F98 NTNU
  • [2] CASSINELLI F, 1982, P TUNN IMM LOND, V82, P73
  • [3] HOWARTH DF, 1986, T I MIN METALL A, V95, pA191
  • [4] Klein S., 1995, P RAP EXC TUNN C, P61
  • [5] RAMEZANZADEH A, 2004, EUROCK 2004 53 GEOM
  • [6] ROSTAMI J, 2002, P N AM ROCK MECH S N
  • [7] Rostami J, 1997, Ph.D. Dissertation Mining Engineering
  • [8] TBM performance estimation using rock mass classifications
    Sapigni, M
    Berti, M
    Bethaz, E
    Busillo, A
    Cardone, G
    [J]. INTERNATIONAL JOURNAL OF ROCK MECHANICS AND MINING SCIENCES, 2002, 39 (06) : 771 - 788