共 14 条
[1]
Chan D. W. M., 1997, International Journal of Project Management, V15, P55, DOI 10.1016/S0263-7863(96)00039-7
[3]
RISK MANAGEMENT PERCEPTIONS AND TRENDS OF US CONSTRUCTION
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1995, 121 (04)
:422-429
[4]
Generic methodology for analyzing delay claims
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1999, 125 (06)
:409-419
[5]
Kometa ST., 1995, ENG CONSTR ARCHIT MA, V2, P57, DOI [10.1108/eb021003, DOI 10.1108/EB021003]
[6]
KOMETA TS, 1994, CONSTRUCTION MANAGEM, V12, P433
[7]
Koushki P. A., 2004, Engineering Construction and Architectural Management, V11, P126, DOI 10.1108/09699980410527867
[8]
Kumaraiah V, 1998, NIMHANS J, V16, P1
[9]
Mendenhall W., 1993, LANGUAGE, V17
[10]
Miller D.C., 1991, HDB RES DESIGN SOCIA