Collaborative Evolution Mechanism and Simulation of Construction Waste Recycling Stakeholders Based on Social Network

被引:8
|
作者
Shao, Zhiguo [1 ,2 ]
Li, Mengdi [1 ]
Yu, Dehu [3 ]
Han, Chuanfeng [2 ]
Meng, Lingpeng [4 ]
机构
[1] Qingdao Univ Technol, Sch Management Engn, Qingdao 266525, Peoples R China
[2] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
[3] Qingdao Univ Technol, Sch Civil Engn, Qingdao 266525, Peoples R China
[4] Shanghai Maritime Univ, China Inst FTZ Supply Chain, Shanghai 201306, Peoples R China
基金
中国国家自然科学基金;
关键词
construction waste recycling; evolutionary game; external environment; numerical simulation; social network analysis; CONCRETE; AGGREGATE;
D O I
10.3390/buildings12122255
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
With the continuous advancement of urbanization, a huge amount of construction waste is generated in large-scale construction activities, which has aggravated the problems of environmental pollution, waste of resources and destruction of city appearance. Construction waste recycling can effectively solve these problems. However, the recycling rate of construction waste is low in China. Therefore, this paper, firstly through the way of literature analysis and questionnaire investigation, analyzes the factors that influence construction waste resource utilization, determines the key influence factors and the stakeholders in the process of construction waste resource utilization, and uses social network analysis method to identify core stakeholders. On this basis, this paper selects construction enterprises and recycling enterprises as the game subjects, and the government and the public as the external environment to explore the influence of the external environment on the cooperation behavior of the two stakeholders, and uses Matlab simulation to analyze the influence of external variables on the decision-making behavior evolution of the two stakeholders. The research results show that the government, construction enterprises, recycling enterprises and the public are the four core stakeholders of the construction waste recycling system, which have the power to control the information transmission among other stakeholders and play a great supporting role in the smooth implementation of the construction waste recycling project. Among them, the construction enterprise and recycling enterprise are the construction waste recycling system's two stakeholders playing the pivotal role, and the government and the public are the external environment of the construction waste recycling system's incentive and regulatory effect. The difference between the benefits and costs of the two stakeholders and the effect intensity of the external environment determines the stable state of the system, that is, the stronger the effect of the external environment and the larger the difference, the more the behavior of the two tends toward the recycling, on-site recycling strategy. Government penalties and rewards can effectively reduce the illegal dumping of construction waste, while excessive penalties and rewards have limitations in controlling illegal dumping. Public participation can effectively improve the efficiency of government supervision. The research results help to deeply understand the behavior, needs and cooperation of stakeholders in the construction waste recycling market, improve the efficiency of cooperation between construction enterprises and recycling enterprises, and provide management inspiration for the construction waste recycling practice.
引用
收藏
页数:19
相关论文
共 50 条
  • [21] Shipping Logistics Network Optimization with Stochastic Demands for Construction Waste Recycling: A Case Study in Shanghai, China
    Wu, Ping
    Song, Yue
    Wang, Xiangdong
    SUSTAINABILITY, 2025, 17 (03)
  • [22] Collaborative Governance of Tower Crane Safety in the Chinese Construction Industry: A Social Network Perspective
    Yang, Ying
    Shao, Bo
    Jin, Lianghai
    Zheng, Xiazhong
    BUILDINGS, 2022, 12 (06)
  • [23] Evolutionary Mechanism of Government Green Development Behavior in Construction and Demolition Waste Recycling Projects: A Perspective of Ecological Compensation
    Chen, Weihong
    Yin, Wenjun
    Yi, Beiyu
    Xu, Shiqi
    Zhang, Hao
    Li, Xingwei
    BUILDINGS, 2023, 13 (07)
  • [24] Evolutionary Game Analysis for Promoting the Realization of Construction Waste Recycling and Resource Utilization: Based on a Multi-Agent Collaboration Perspective
    Song, Wenxuan
    Hou, Guisheng
    Yang, Lei
    Wang, Pengmin
    Guo, Yanlu
    BUILDINGS, 2024, 14 (08)
  • [25] Research on Organization Network Model for Construction Project based on Social Network Analysis
    Yang Lin
    ADVANCED BUILDING MATERIALS AND SUSTAINABLE ARCHITECTURE, PTS 1-4, 2012, 174-177 : 2001 - 2005
  • [26] Improving Social Sustainability in Construction: Conceptual Framework Based on Social Network Analysis
    Wang, Hongdi
    Zhang, Xiaoling
    Lu, Weisheng
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2018, 34 (06)
  • [27] Research on Construction Project Organization Based on Social Network Analysis
    Zhang, Songyan
    Fang, Yuxiao
    WIRELESS PERSONAL COMMUNICATIONS, 2018, 102 (02) : 1867 - 1877
  • [28] Research on Construction Project Organization Based on Social Network Analysis
    Songyan Zhang
    Yuxiao Fang
    Wireless Personal Communications, 2018, 102 : 1867 - 1877
  • [29] Overcoming barriers to off-site construction through engaging stakeholders: A two-mode social network analysis
    Gan, Xiaolong
    Chang, Ruidong
    Wen, Tao
    JOURNAL OF CLEANER PRODUCTION, 2018, 201 : 735 - 747
  • [30] Knowledge integration process in construction projects: a social network analysis approach to compare competitive and collaborative working
    Ruan, Ximing
    Ochieng, Edward G.
    Price, Andrew D. F.
    Egbu, Charles O.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2012, 30 (01) : 5 - 19