Quicker opening of bituminous asphalt pavements to traffic by use of mechanical impedance measurements

被引:0
作者
Huebelt, J. [1 ]
Lindemann, J. [1 ]
Wolf, S. [2 ]
Wellner, F. [3 ]
机构
[1] Hsch Mittweida, Mittweida, Germany
[2] Wolf Strassen & Tiefbau GmbH, Reinsdorf, Germany
[3] Tech Univ Dresden, Fak Bauingenieurwesen, Dresden, Germany
来源
CIVIL ENGINEERING AND URBAN PLANNING IV | 2016年
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Among others, the long term durability of road pavements is influenced by the time gap between the laying process and the opening to traffic. Here, in this project a rather simple method for the estimation of the time for opening the pavement to traffic after the laying process is discussed. Therefore in the first part of the paper a technique for the measurement of the mechanical input impedance is introduced. On the basis of this measurement the Young's modulus is estimated at 5 Hz and 20 degrees C by use of the temperature/frequency equivalence. In the second part of the project the method has been applied to five new built German pavements. Moreover, by applying a first rough assumption for the setting of asphalts the time for opening the pavements to traffic has been estimated.
引用
收藏
页码:231 / 234
页数:4
相关论文
共 5 条
  • [1] Francken, 1974, TRANSPORT RES REC, V515, P114
  • [2] HECKL M., 1994, TASCHENBUCH TECHNISC, V2, DOI DOI 10.1007/978-3-642-97356-7
  • [3] Huebelt J., 2010, 17 INT C SOUND VIBR
  • [4] Witczak M., 2004, MAT PROPERTIES IMPLE
  • [5] ZTV-Asphalt-StB, 2007, ZUS TECHN VERTR BED