Joint optimization of LORA and spares stocks considering corrective maintenance time

被引:6
作者
Guo, Linhan [1 ]
Fan, Jiujiu [1 ]
Wen, Meilin [1 ]
Kang, Rui [1 ]
机构
[1] Beihang Univ, Sch Reliabil & Syst Engn, Beijing 100191, Peoples R China
基金
中国国家自然科学基金;
关键词
level of repair; spares; convex optimization; multi-echelon multi-indenture (MEMI); REPAIR ANALYSIS; LEVEL; LOCATION; MODEL;
D O I
10.1109/JSEE.2015.00012
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Level of repair analysis (LORA) is an important method of maintenance decision for establishing systems of operation and maintenance in the equipment development period. Currently, the research on equipment of repair level focuses on economic analysis models which are used to optimize costs and rarely considers the maintenance time required by the implementation of the maintenance program. In fact, as to the system requiring high mission complete success, the maintenance time is an important factor which has a great influence on the availability of equipment systems. Considering the relationship between the maintenance time and the spares stocks level, it is obvious that there are contradictions between the maintenance time and the cost. In order to balance these two factors, it is necessary to build an optimization LORA model. To this end, the maintenance time representing performance characteristic is introduced, and on the basis of spares stocks which is traditionally regarded as a decision variable, a decision variable of repair level is added, and a multi-echelon multi-indenture (MEMI) optimization LORA model is built which takes the best cost-effectiveness ratio as the criterion, the expected number of backorder (EBO) as the objective function and the cost as the constraint. Besides, the paper designs a convex programming algorithm of multi-variable for the optimization model, provides solutions to the non-convex objective function and methods for improving the efficiency of the algorithm. The method provided in this paper is proved to be credible and effective according to the numerical example and the simulation result.
引用
收藏
页码:85 / 95
页数:11
相关论文
共 21 条
[1]   Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities [J].
Alfredsson, P .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1997, 99 (03) :584-595
[2]   SIMPLE SOLUTION PROCEDURES FOR A CLASS OF 2-ECHELON INVENTORY PROBLEMS [J].
AXSATER, S .
OPERATIONS RESEARCH, 1990, 38 (01) :64-69
[3]   A combinatorial approach to level of repair analysis [J].
Barros, L ;
Riley, M .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2001, 129 (02) :242-251
[4]  
Barros L. L., 1998, IMA Journal of Mathematics Applied in Business and Industry, V9, P403, DOI 10.1093/imaman/9.4.403
[5]   Joint optimization of level of repair analysis and spare parts stocks [J].
Basten, R. J. I. ;
van der Heijden, M. C. ;
Schutten, J. M. J. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2012, 222 (03) :474-483
[6]   A minimum cost flow model for level of repair analysis [J].
Basten, R. J. I. ;
van der Heijden, M. C. ;
Schutten, J. M. J. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 133 (01) :233-242
[7]   Practical extensions to a minimum cost flow model for level of repair analysis [J].
Basten, R. J. I. ;
van der Heijden, M. C. ;
Schutten, J. M. J. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2011, 211 (02) :333-342
[8]   An efficient model formulation for level of repair analysis [J].
Basten, R. J. I. ;
Schutten, J. M. J. ;
van der Heijden, M. C. .
ANNALS OF OPERATIONS RESEARCH, 2009, 172 (01) :119-142
[9]  
BLANCHARD B, 2002, SYSTEMS ENG ANAL
[10]  
Blanchard BenjaminS., 2004, LOGISTICS ENG MANAGE