Game Model for the Allocation of the Cooperative Surplus in the Public-Private Partnership

被引:0
|
作者
An, Hui [1 ]
Zheng, Han-lu [1 ]
机构
[1] China Three Gorges Univ, Coll Hydraul & Environm Engn, Yichang, Hubei, Peoples R China
来源
PROCEEDINGS OF THE 5TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2014) | 2015年
关键词
Cooperative surplus; Game Model; Incomplete contract; PPP projects; COSTS;
D O I
10.2991/978-94-6239-100-0_67
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The incompleteness of PPP contracts provides opportunities for the public and private partners to cooperate again in the consultative phase, and then both sides in the contract can get the cooperative surplus from the cooperation on the unclear defined matters by the initial contract. For the interest allocation of this part, an incomplete information game model is formed on this basis, the analysis of the factors in the allocation, it comes out that the type of the player and the patience have the more significant impact on the final result.
引用
收藏
页码:365 / 368
页数:4
相关论文
共 50 条
  • [21] Risk Sharing Model of Urban Renewal Public-Private Partnership Project Based on Tripartite Game
    Du X.
    Li M.
    Huang Y.
    Tang X.
    Tongji Daxue Xuebao/Journal of Tongji University, 2023, 51 (01): : 145 - 152
  • [22] Application of risk analysis and allocation model on public-private partnership power transmission line projects
    Kate, Ganesh Sadashiv
    Patil, Pandurang Shanakar
    INTERNATIONAL JOURNAL OF CRITICAL INFRASTRUCTURES, 2020, 16 (03) : 240 - 254
  • [23] Evolutionary Game Analysis of the Supervision Behavior for Public-Private Partnership Projects with Public Participation
    Li, Congdong
    Li, Xiaoli
    Wang, Yu
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2016, 2016
  • [24] An Evolutionary Game Model on Public Participation in Public-Private Partnerships
    Song, Danrong
    Sun, Yan
    Fan, Yu
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [25] PUBLIC CORPORATIONS - NATIONALIZATION OR AN EXAMPLE OF EFFECTIVE MODEL OF PUBLIC-PRIVATE PARTNERSHIP?
    Tertishnyi, S. A.
    JOURNAL OF MINING INSTITUTE, 2009, 184 : 270 - 275
  • [26] PUBLIC-PRIVATE PARTNERSHIP IN PERFORMING PUBLIC AFFAIRS
    Persoli, Ana Marija
    CROATIAN AND COMPARATIVE PUBLIC ADMINISTRATION, 2010, 10 (04): : 1019 - 1044
  • [27] Evolutionary game model for the behavior of private sectors in elderly healthcare public-private partnership under the condition of information asymmetry
    Yue, Xianghua
    Durrani, Shahzad Khan
    Li, Runfa
    Liu, Wenling
    Manzoor, Shahid
    Anser, Muhammad Khalid
    BMC HEALTH SERVICES RESEARCH, 2025, 25 (01)
  • [28] A Procedure for Entering into a Public-Private Partnership
    Zeleznik, Milan
    LEX LOCALIS-JOURNAL OF LOCAL SELF-GOVERNMENT, 2009, 7 (01): : 83 - 105
  • [29] FEASIBILITY STUDY OF PUBLIC-PRIVATE PARTNERSHIP
    Meidute, Ieva
    Paliulis, Narimantas Kazimieras
    INTERNATIONAL JOURNAL OF STRATEGIC PROPERTY MANAGEMENT, 2011, 15 (03) : 257 - 274
  • [30] Transport Infrastructure and Public-Private Partnership
    Langhagen-Rohrbach, Christian
    RAUMFORSCHUNG UND RAUMORDNUNG, 2007, 65 (06) : 539 - 545