Game Model for the Allocation of the Cooperative Surplus in the Public-Private Partnership

被引:0
作者
An, Hui [1 ]
Zheng, Han-lu [1 ]
机构
[1] China Three Gorges Univ, Coll Hydraul & Environm Engn, Yichang, Hubei, Peoples R China
来源
PROCEEDINGS OF THE 5TH INTERNATIONAL ASIA CONFERENCE ON INDUSTRIAL ENGINEERING AND MANAGEMENT INNOVATION (IEMI2014) | 2015年
关键词
Cooperative surplus; Game Model; Incomplete contract; PPP projects; COSTS;
D O I
10.2991/978-94-6239-100-0_67
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The incompleteness of PPP contracts provides opportunities for the public and private partners to cooperate again in the consultative phase, and then both sides in the contract can get the cooperative surplus from the cooperation on the unclear defined matters by the initial contract. For the interest allocation of this part, an incomplete information game model is formed on this basis, the analysis of the factors in the allocation, it comes out that the type of the player and the patience have the more significant impact on the final result.
引用
收藏
页码:365 / 368
页数:4
相关论文
共 10 条
[1]  
[Anonymous], INT J PROJECT MANAGE
[2]   Incomplete contracts and public ownership: Remarks, and an application to public-private partnerships [J].
Hart, O .
ECONOMIC JOURNAL, 2003, 113 (486) :C69-C76
[3]   Risk allocation and the costs and benefits of public--private partnerships [J].
Iossa, Elisabetta ;
Martimort, David .
RAND JOURNAL OF ECONOMICS, 2012, 43 (03) :442-474
[4]   A game theory approach for the allocation of risks in transport public private partnerships [J].
Medda, Francesca .
International Journal of Project Management, 2007, 25 (03) :213-218
[5]   THE PRACTICE OF CONTRACTING IN PUBLIC PRIVATE PARTNERSHIPS: TRANSACTION COSTS AND RELATIONAL CONTRACTING IN THE IRISH SCHOOLS SECTOR [J].
Reeves, Eoin .
PUBLIC ADMINISTRATION, 2008, 86 (04) :969-986
[6]  
Scharle Peter., 2002, Innovation, V15, P227
[7]  
Xiaosu Ye, 2014, P 17 INT S ADV CONST
[8]  
Xu Xia, 2009, URBAN STUD, V16, P104
[9]   Critical success factors for public-private partnerships in infrastructure development [J].
Zhang, XQ .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (01) :3-14
[10]  
ZHENG J, 2008, J PURCH SUPPLY MANAG, V14, P43, DOI DOI 10.1016/J.PURSUP.2008.01.004