共 50 条
- [1] Over-reaching factor for distance relay with Mho characteristic 2007 42ND INTERNATIONAL UNIVERSITIES POWER ENGINEERING CONFERENCE, VOLS 1-3, 2007, : 333 - 337
- [2] Distance relay over-reaching due to installation of TCSC on next line 2006 IEEE INTERNATIONAL SYMPOSIUM ON INDUSTRIAL ELECTRONICS, VOLS 1-7, 2006, : 1954 - 1959
- [3] Distance relay over-reaching due to TCSC presence on second circuit of double circuit line POWERENG2007: INTERNATIONAL CONFERENCE ON POWER ENGINEERING - ENERGY AND ELECTRICAL DRIVES PROCEEDINGS, VOLS 1 & 2, 2007, : 481 - 486
- [4] Distance relay over-reaching due to SSSC presence on second circuit of double circuit line ICIEA 2008: 3RD IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS, PROCEEDINGS, VOLS 1-3, 2008, : 918 - 923
- [7] Distance Relay Over-Reaching due to TCSC Presence on Second Circuit of Double Circuit Line Considering MOV Operation 2008 IEEE MEDITERRANEAN ELECTROTECHNICAL CONFERENCE, VOLS 1 AND 2, 2008, : 717 - 722
- [9] NEW TECHNIQUE FOR QUADRILATERAL DISTANCE RELAY PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1974, 121 (11): : 1421 - 1422
- [10] NEW TECHNIQUE FOR QUADRILATERAL DISTANCE RELAY PROCEEDINGS OF THE INSTITUTION OF ELECTRICAL ENGINEERS-LONDON, 1974, 121 (06): : 464 - 466