Risk Prediction of Rock Bursts and Large Deformations in YL Tunnel of the Chongqing-Kunming High-Speed Railway

被引:2
|
作者
Liu, Yuxuan [1 ]
Zhang, Yuqi [1 ]
Su, Peidong [1 ]
Zhang, Guangze [2 ]
Qiu, Peng [1 ]
Tang, Lin [2 ]
机构
[1] Southwest Petr Univ, Sch Geosci & Technol, Chengdu, Peoples R China
[2] China Railway Eryuan Engn Grp Co Ltd, Chengdu, Peoples R China
关键词
geohazards; ground stress; geologic problems; deep-buried tunnels; prevention measures; ROCKBURST; CLASSIFICATION; MECHANISM; DAMAGE; MODEL;
D O I
10.3389/feart.2022.892606
中图分类号
P [天文学、地球科学];
学科分类号
07 ;
摘要
The YL Tunnel of the Chongqing-Kunming high-speed railway project, a key project of the whole line, is a typical ultra-long deep tunnel facing geologic problems, such as rock bursts, large deformation, water inrush, and toxic or harmful gas leakage, among which high ground stress results in the most serious damage. This study incorporates existing studies and materials, as well as data on ground stress obtained through tests using the hydrofracturing technique. The areas with rock bursts and large deformations were divided accordingly, and preventive measures were expounded. The results showed that the areas predicted as high risk of severe rock burst were D1K338 + 945-D1K339 + 025 and D1K339 + 075-D1K339 + 220, which is of significance when constructing the whole Chongqing-Kunming high-speed railway and may even be instructive in railway construction in the southwest region of China.
引用
收藏
页数:10
相关论文
共 50 条
  • [1] Seismic vulnerability analysis of typical continuous girder bridges of Chongqing-Kunming high-speed railway
    Hu, Dongyang
    Journal of Railway Science and Engineering, 2021, 18 (02) : 297 - 305
  • [2] Comprehensive prediction of rockburst in high-speed railway tunnel
    Li, Bo
    Wu, Li
    Xu, Changmao
    Li, Zhigang
    Zuo, Qingjun
    APPLIED MECHANICS AND MATERIALS II, PTS 1 AND 2, 2014, 477-478 : 553 - +
  • [3] Prediction of surrounding rock convergence deformation of high-speed railway tunnel based on combined model
    Li, Zhaozhong
    Wang, Hao
    Chang, Xiangyu
    Zhang, Yiming
    Wang, Feiqiu
    Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2021, 51 (05): : 851 - 858
  • [4] An Application of Comprehensive Geological Prediction Methods in a High-Speed Railway Tunnel
    Yin, Peng
    Yao, Ruiting
    Ji, Xiaolei
    ADVANCES IN CIVIL INFRASTRUCTURE ENGINEERING, PTS 1 AND 2, 2013, 639-640 : 279 - +
  • [5] STUDY OF EXCAVATION METHODS OF HIGH-SPEED RAILWAY TUNNEL IN THE WEAK SURROUNDING ROCK
    Zhu, Haobo
    Sun, Feng
    Zhang, Dingli
    KEY TECHNOLOGIES OF RAILWAY ENGINEERING - HIGH SPEED RAILWAY, HEAVY HAUL RAILWAY AND URBAN RAIL TRANSIT, 2010, : 873 - 876
  • [6] Inversion Analysis of Mechanical Parameters of Surrounding Rock in High-speed Railway Tunnel
    Wang, Hao
    Chang, Xiangyu
    Zhang, Yiming
    Liang, Ruijun
    Wang, Feiqiu
    Tao, Lei
    Li, Zhaozhong
    Journal of Railway Engineering Society, 2020, 37 (09) : 47 - 53
  • [7] Instability Mechanism of Surrounding Rock for Super-Large Cross Section at High-speed Railway Tunnel Portal
    Wu Shuanglan
    Yang Shihao
    Zhang Xuewen
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING, PTS 1-4, 2013, 353-356 : 1597 - 1603
  • [8] Influence of Surrounding Rock Creep on Invert Heave of High-speed Railway Tunnel in Mudstone
    Liang, Qingguo
    Yue, Jianping
    Zhou, Wendi
    Sun, Weiyu
    Li, Jing
    Journal of Railway Engineering Society, 2024, 41 (03) : 80 - 85
  • [9] Field test and theoretical study of rock resistant coefficient in high-speed railway tunnel
    Li Bo
    Wu Li
    Deng Zong-wei
    Chen Jian
    Tang Ai-song
    ROCK AND SOIL MECHANICS, 2015, 36 (02) : 532 - 540
  • [10] Prediction of the Surrounding Rock Deformation Grade for a High-Speed Railway Tunnel Based on Rough Set Theory and a Cloud Model
    Daohong Qiu
    Yang Liu
    Yiguo Xue
    Maoxin Su
    Ying Zhao
    Jiuhua Cui
    Fanmeng Kong
    Zhiqiang Li
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2021, 45 : 303 - 314