Combinatorial Benders' Cut for the Admission Control Decision in Flow Shop Scheduling Problems with Queue Time Constraints

被引:2
作者
Nurdiansyah, Rudi [1 ,2 ]
Hong, I-Hsuan [1 ]
机构
[1] Natl Taiwan Univ, Inst Ind Engn, Taipei 10617, Taiwan
[2] Univ Negeri Malang, Dept Ind Engn, Malang 65145, Indonesia
来源
ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: PRODUCTION MANAGEMENT FOR DATA-DRIVEN, INTELLIGENT, COLLABORATIVE, AND SUSTAINABLE MANUFACTURING, APMS 2018 | 2018年 / 535卷
关键词
Flow shop; Queue time constraint; Combinatorial Benders' cut; SEMICONDUCTOR WAFER FABRICATION; ALGORITHM;
D O I
10.1007/978-3-319-99704-9_49
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper presents the mixed-integer linear programming (MILP) based model to approach the admission control in flow shop scheduling problem with queue time constraints, where there are various upper bounds limit in each queue. The scheduling proposed in this paper iteratively retrieves the real-time status of a production system such as machine failures and recoveries, and job arrivals in each step and generate the most updated scheduling result at each decision time. Our objective function is to minimize the occurrence of queue time violation. We solve the MILP using combinatorial Benders' cut (CBC), where the MILP model is decomposed into two independent parts: the binary variables as a master problem and the continuous variables as a slave problem. We compare the CBC with the results gained from the CPLEX. The numerical results indicate that the CBC indeed effectively and efficiently reaches the good feasible solution within a reasonable timeframe in the context of timely updating scheduling problem.
引用
收藏
页码:399 / 405
页数:7
相关论文
共 16 条
[1]   Influence of capacity- and time-constrained intermediate storage in two-stage food production systems [J].
Akkerman, Renzo ;
van Donk, Dirk Pieter ;
Gaalman, Gerard .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2007, 45 (13) :2955-2973
[2]   Combinatorial Benders cuts for assembly line balancing problems with setups [J].
Akpinar, Sener ;
Elmi, Atabak ;
Bektas, Tolga .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 259 (02) :527-537
[3]  
[Anonymous], 1963, DYNAMIC PROGRAMMING
[4]   A combinatorial benders' cuts algorithm for the quayside operation problem at container terminals [J].
Chen, Jiang Hang ;
Lee, Der-Horng ;
Cao, Jin Xin .
TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2012, 48 (01) :266-275
[5]   Combinatorial benders' cuts for mixed-integer linear programming [J].
Codato, Gianni ;
Fischetti, Matteo .
OPERATIONS RESEARCH, 2006, 54 (04) :756-766
[6]   Decomposition-based classified ant colony optimization algorithm for scheduling semiconductor wafer fabrication system [J].
Guo, Chengtao ;
Jiang, Zhibin ;
Zhang, Huai ;
Li, Na .
COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 62 (01) :141-151
[7]   A decomposition approach for the scheduling of a steel plant production [J].
Harjunkoski, I ;
Grossmann, IE .
COMPUTERS & CHEMICAL ENGINEERING, 2001, 25 (11-12) :1647-1660
[8]   Scheduling Wafer Lots on Diffusion Machines in a Semiconductor Wafer Fabrication Facility [J].
Kim, Yeong-Dae ;
Joo, Byung-Jun ;
Choi, So-Young .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2010, 23 (02) :246-254
[9]  
Robinson J. K., 1999, WSC'99. 1999 Winter Simulation Conference Proceedings. `Simulation - A Bridge to the Future' (Cat. No.99CH37038), P880, DOI 10.1109/WSC.1999.823301
[10]   Implementation of modeling and simulation in semiconductor wafer fabrication with time constraints between wet etch and furnace operations [J].
Scholl, W ;
Domaschke, J .
IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2000, 13 (03) :273-277