Reasonable Paths of Construction Ventilation for Large-Scale Underground Cavern Groups in Winter and Summer

被引:11
|
作者
Sun, Jianchun [1 ]
Zhang, Heng [1 ,2 ]
Huang, Muyan [3 ]
Chen, Qianyang [1 ]
Chen, Shougen [1 ]
机构
[1] Southwest Jiaotong Univ, Key Lab Transportat Tunnel Engn, Minist Educ, Sch Civil Engn, Chengdu 610031, Sichuan, Peoples R China
[2] Univ Warwick, Sch Engn, Coventry CV4 7AL, W Midlands, England
[3] Sichuan Technol & Business Univ, Inst Foreign Languages, Meishan 620000, Peoples R China
基金
中国国家自然科学基金;
关键词
underground caverns; construction ventilation; natural ventilation; air velocity distribution; CO distribution; fan arrangement; field test; numerical simulation; AUXILIARY VENTILATION; NUMERICAL-SIMULATION; TUNNEL; SYSTEM; BEHAVIOR; STORAGE; FLOW; CFD;
D O I
10.3390/su10103768
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Forced ventilation or newly built vertical shafts are mainly used to solve ventilation problems in large underground cavern groups. However, it is impossible to increase air supply due to the size restriction of the construction roadway, resulting in ventilation deterioration. Based on construction of the Jinzhou underground oil storage project, we proposed both a summer ventilation scheme and winter ventilation scheme, after upper layer excavation of the cavern is completed and connected with the shaft. A three-dimensional numerical model validated with field test data was performed to investigate air velocity and CO concentration. Fan position optimization and the influence of temperature difference on natural ventilation were discussed. The results show that CO concentration in the working area of the cavern can basically drop to a safe value of 30 mg/m(3) in air inlet and exhaust schemes after 10 min of ventilation. Since there is inevitably a back-flow in the winter ventilation scheme, it is necessary to ensure that airflow is always moving towards the shaft. Optimal placement of the axial flow fan at the shaft bottom is on the central axis of the cavern, 5 m away from the shaft. The greater the temperature difference, the better the natural ventilation effect of the shaft. The natural ventilation effect of the shaft as an outlet in winter, is better than that of the shaft as an inlet in summer.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] Mediterranean summer temperature and winter precipitation, large-scale dynamics, trends
    Xoplaki, E.
    Luterbacher, J.
    Gonzalez-Rouco, J. F.
    NUOVO CIMENTO C-COLLOQUIA AND COMMUNICATIONS IN PHYSICS, 2006, 29 (01): : 45 - 54
  • [22] Application of the observational construction technique for large underground cavern excavation
    Maejima, T
    Morioka, H
    Mori, T
    Aoki, K
    ROCK MECHANICS: A CHALLENGE FOR SOCIETY, 2001, : 443 - 448
  • [23] Design and construction of a large underground cavern in Atlanta, Georgia, USA
    Pennington, T. W.
    Cook, R. E.
    Richards, D. P.
    Barnes, G.
    UNDERGROUND SPACE - THE 4TH DIMENSION OF METROPOLISES, VOLS 1-3, 2007, : 237 - +
  • [24] LARGE-SCALE UNDERGROUND MINING
    ALMGREN, G
    SCANDINAVIAN JOURNAL OF METALLURGY, 1987, 16 (01) : 29 - 32
  • [25] Numerical Simulation and Evaluation of Construction Process on Large-scale Underground Plants
    Zuo, Shuangying
    Wang, Xingjian
    2010 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), 2010,
  • [26] Splitting failure in side walls of a large-scale underground cavern group: a numerical modelling and a field study
    Wang, Zhishen
    Li, Yong
    Zhu, Weishen
    Xue, Yiguo
    Yu, Song
    SPRINGERPLUS, 2016, 5
  • [27] Physical Model Tests on the Effect of Anchoring on the Splitting Failure of Deep Large-Scale Underground Rock Cavern
    Guangyuan Yu
    Qiangyong Zhang
    Fan Li
    Lei Cheng
    Xin Guo
    Geotechnical and Geological Engineering, 2021, 39 : 4545 - 4562
  • [28] Real-time safety evaluation and early warning of large-scale underground cavern group during construction period based on internet of things
    Sa, Wenqi
    Zhang, Sherong
    Zhang, Lianming
    Sa, Wenqi, 1600, Academia Sinica (33): : 2301 - 2313
  • [29] Physical Model Tests on the Effect of Anchoring on the Splitting Failure of Deep Large-Scale Underground Rock Cavern
    Yu, Guangyuan
    Zhang, Qiangyong
    Li, Fan
    Cheng, Lei
    Guo, Xin
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2021, 39 (06) : 4545 - 4562
  • [30] Construction Technology of Large Pipe-shed Support in Large-scale Underground Projects
    Liang Zhanfan
    Meng Lihe
    PROCEEDINGS OF SHANGHAI INTERNATIONAL CONFERENCE ON TECHNOLOGY OF ARCHITECTURE AND STRUCTURE, PT II, 2009, : 194 - 203