A Cooperative Solver for Single Machine Total Weighted Tardiness Scheduling Problem

被引:0
作者
Chaabane, Lamiche [1 ]
机构
[1] Mohamed Boudiaf Univ, Dept Comp Sci, Msila, Algeria
来源
PROCEEDINGS OF 2017 FIRST INTERNATIONAL CONFERENCE ON EMBEDDED & DISTRIBUTED SYSTEMS (EDIS 2017) | 2017年
关键词
improved genetic simulated annealing; genetic algorithm; improved simulated annealing; benchmarks; ALGORITHM; MINIMIZE; SEARCH;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, we aim to present a novel efficient approach called improved genetic simulated annealing algorithm (IGASA) in order to minimize the total weighted tardiness of n jobs on a single machine, which is recognized in the literature as a strong NP-hard Problem. The proposed model takes advantages of the genetic algorithm (GA) as a global search strategy and the capability of the improved simulated annealing (ISA) technique to improve solution quality in local regions. Experimental results on a set of benchmarks demonstrated the potent of our developed algorithm to find a good solutions which are significantly outperforms some other published works.
引用
收藏
页码:220 / 224
页数:5
相关论文
共 50 条
  • [31] Multiple-variable neighbourhood search for the single-machine total weighted tardiness problem
    Chung, Tsui-Ping
    Fu, Qunjie
    Liao, Ching-Jong
    Liu, Yi-Ting
    ENGINEERING OPTIMIZATION, 2017, 49 (07) : 1133 - 1147
  • [32] Distributionally robust single machine scheduling with the total tardiness criterion
    Niu, Shengsheng
    Song, Shiji
    Ding, Jian-Ya
    Zhang, Yuli
    Chiong, Raymond
    COMPUTERS & OPERATIONS RESEARCH, 2019, 101 : 13 - 28
  • [33] Single machine scheduling with controllable processing times to minimize total tardiness and earliness
    Kayvanfar, Vahid
    Mahdavi, Iraj
    Komaki, Gh. M.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 65 (01) : 166 - 175
  • [34] Parallel branch-and-price algorithms for the single machine total weighted tardiness scheduling problem with sequence-dependent setup times
    Speckenmeyer, Philipp
    Hilmer, Constanze
    Rauchecker, Gerhard
    Schryen, Guido
    COMPUTERS & OPERATIONS RESEARCH, 2025, 173
  • [35] Minimizing Total Weighted Tardiness and Earliness on a Single Machine Production Scheduling Problem with Multi-task Maintenance Policy and Deteriorating Jobs
    Haddad, Hamidreza
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2014, 39 (08) : 6543 - 6553
  • [36] Scatter search for minimizing weighted tardiness in a single machine scheduling with setups
    Gonzalez, Miguel A.
    Jose Palacios, Juan
    Vela, Camino R.
    Hernandez-Arauzo, Alejandro
    JOURNAL OF HEURISTICS, 2017, 23 (2-3) : 81 - 110
  • [37] Single-machine common due date total earliness/tardiness scheduling with machine unavailability
    Bulbul, Kerem
    Kedad-Sidhoum, Safia
    Sen, Halil
    JOURNAL OF SCHEDULING, 2019, 22 (05) : 543 - 565
  • [38] A Novel Ant Colony Algorithm for the Single-Machine Total Weighted Tardiness Problem with Sequence Dependent Setup Times
    Ahmadizar, Fardin
    Hosseini, Leila
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2011, 4 (04): : 456 - 466
  • [39] Extended GRASP for the job shop scheduling problem with total weighted tardiness objective
    Bierwirth, C.
    Kuhpfahl, J.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 261 (03) : 835 - 848
  • [40] An iterated greedy algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times
    Deng, Guanlong
    Gu, Xingsheng
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE, 2014, 45 (03) : 351 - 362