A Bayesian belief network framework for nuclear power plant human reliability analysis accounting for dependencies among performance shaping factors

被引:15
作者
Liu, Jianqiao [1 ]
Zou, Yanhua [1 ]
Wang, Wei [2 ,3 ]
Zio, Enrico [4 ,5 ]
Yuan, Chengwei [6 ]
Wang, Taorui [2 ]
Jiang, Jianjun [1 ]
机构
[1] Hunan Inst Technol, Inst Human Factors & Safety Engn, Hengyang 421002, Peoples R China
[2] City Univ Hong Kong, Dept Mech Engn, Kowloon, Hong Kong, Peoples R China
[3] Shenzhen Res Inst City Univ Hong Kong, Shenzhen 518057, Peoples R China
[4] Politecn Milan, DOE, Via Masa 34, I-20156 Milan, Italy
[5] PSL Univ Paris, MINES ParisTech, Ctr Rech Risques & Crises CRC, Sophia Antipolis, Paris, France
[6] Univ South China, Comp Sch, Software Sch, Hengyang 421001, Peoples R China
基金
中国国家自然科学基金;
关键词
Human reliability analysis; Nuclear power plant; Performance shaping factor; Dependency; Bayesian belief network; Uncertainty; Monte Carlo; SIMULATION;
D O I
10.1016/j.ress.2022.108766
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A challenge to Human Reliability Analysis (HRA) for Nuclear Power Plants (NPPs) lies in the fact that de-pendencies among Performance Shaping Factors (PSFs) are difficult to deal with due to insufficient knowledge, information and data available. Existing treatment relies heavily on the subjective expert judgment and the dependencies are compromised with the quantities of PSFs, simultaneously, neglects their uncertain interactions. This study proposes a Bayesian Belief Network (BBN) framework for structuring the uncertain dependencies among PSFs and estimate the Human Error Probabilities (HEPs) giving due account to such dependencies. An Exploratory Factor Analysis (EFA) technique is used to analyze human error events and cluster the dependent PSFs into clusters, which serve as the nodes connecting the parent PSF nodes with the child HEP node. Monte Carlo (MC) sampling operationalizes the framework, accounting for the uncertainty that affects PSF clustering and the data filling of conditional probability tables is performed by a Fenton approach.The framework is illustrated by considering 89 human error reports of China NPPs. The results show that the human mental related PSFs complexity, stress/stressor and fitness for duty are highly and steadily dependent, however, the dependencies of the PSFs experience/training and work processes are determined by the specific system situations.
引用
收藏
页数:9
相关论文
共 52 条
  • [1] BN-SLIM: A Bayesian Network methodology for human reliability assessment based on Success Likelihood Index Method (SLIM)
    Abrishami, Shokoufeh
    Khakzad, Nima
    Hosseini, Seyed Mahmoud
    van Gelder, Pieter
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2020, 193
  • [2] Human Reliability Analysis (HRA) Using Standardized Plant Analysis Risk-Human (SPAR-H) and Bayesian Network (BN) for Pipeline Inspection Gauges (PIG) Operation: A Case Study in a Gas Transmission Plant
    Aliabadi, Mostafa Mirzaei
    Esmaeili, Reza
    Mohammadfam, Iraj
    Ashrafi, Maryam
    [J]. HEALTH SCOPE, 2019, 8 (03):
  • [3] [Anonymous], NUREGCR3518 USNRC
  • [4] Bandeira M., 2017, TRANSPORTES, V25, P156, DOI [10.14295/transportes.v25i2.1374, DOI 10.14295/TRANSPORTES.V25I2.1374]
  • [5] Bayesian framework for reliability prediction of subsea processing systems accounting for influencing factors uncertainty
    Bhardwaj, U.
    Teixeira, A. P.
    Guedes Soares, C.
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2022, 218
  • [6] Blackman H S, 2005, NUREG/CR- 6883, INL/EXT-05-00509)
  • [7] Boring R.L., 2010, MANY PERFORMANCE SHA
  • [8] Cognitive modeling and dynamic probabilistic simulation of operating crew response to complex system accidents. Part 2: IDAC performance influencing factors model
    Chang, Y. H. J.
    Mosleh, A.
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2007, 92 (08) : 1014 - 1040
  • [9] Commission UNR, 2006, NUREG1842
  • [10] Commission UNR, 2014, NUREG2127