Investigating the causes of delay in grain bin construction projects: the case of China

被引:26
作者
Chen, Gui-Xiang [1 ]
Shan, Ming [2 ]
Chan, Albert P. C. [3 ]
Liu, Xu [4 ]
Zhao, Yi-Qing [5 ]
机构
[1] Henan Univ Technol, Sch Civil Engn & Architecture, Dept Engn Management, Zhengzhou, Henan, Peoples R China
[2] Natl Univ Singapore, Dept Bldg, Singapore, Singapore
[3] Hong Kong Polytech Univ, Dept Bldg & Real Estate, Hong Kong, Peoples R China
[4] Henan Acad Bldg & Construct, Zhengzhou, Henan, Peoples R China
[5] Tongji Univ, Sch Econ & Management, Dept Management Sci & Engn, Shanghai, Peoples R China
关键词
Cause of delay; grain bin projects; factor analysis; structural equation modelling; CRITICAL SUCCESS FACTORS; MANAGEMENT RESEARCH; PERFORMANCE; SECTOR; RISKS; PLS;
D O I
10.1080/15623599.2017.1354514
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction delay is a common issue in diverse types of projects and has attracted sustained attention from the industry and academia. However, it has seldom been addressed in grain bin projects which have a stricter requirement for on-time delivery to ensure prompt and appropriate grain storage. The aim of this study is to investigate the significant causes of delay in grain bin construction projects in China. To achieve this goal, a comprehensive literature review and 15 structured interviews were carried out, and a self-administered questionnaire was sent out to 108 respondents with experiences in constructing grain bin projects. Results showed that the top five delay causes for grain bin construction projects were 'shortage of adequate equipment,' 'poor communication among contracting parties,' 'problems with subcontractors,' 'inadequate experience of the design team' and 'frequent change orders by clients.' Also, results showed that the most significant delay cause category in grain bin construction projects was contractor-related causes. This study has provided the industry and academia with a deep understanding of the delay issue ingrain bin construction projects, which has also reinforced the knowledge body of delay research in the construction engineering and management domain.
引用
收藏
页码:1 / 14
页数:14
相关论文
共 74 条
[1]  
Aibinu A.A., 2002, INT J PROJ MANAG, V20, P593, DOI [DOI 10.1016/S0263-7863(02)00028-5, 10.1016/S0263-7863, DOI 10.1016/S0263-7863, 10.1016/S0263-7863(02)00028-5]
[2]   Using PLS-SEM technique to model construction organizations' willingness to participate in e-bidding [J].
Aibinu, Ajibade Ayodeji ;
Al-Lawati, Ahmed Murtadha .
AUTOMATION IN CONSTRUCTION, 2010, 19 (06) :714-724
[3]  
Al-Khalil MohammedI., 1999, Construction Management and Economics, V17, P647, DOI 10.1080/014461999371259
[4]   Causes of delays in Saudi Arabian public sector construction projects [J].
Al-Kharashi, Adel ;
Skitmore, Martin .
CONSTRUCTION MANAGEMENT AND ECONOMICS, 2009, 27 (01) :3-23
[5]  
Al-Tabtabai HashemM., 2002, Engineering Journal of the University of Qatar, V15, P19
[6]   The significant factors causing delay of building construction projects in Malaysia [J].
Alaghbari, Wa'el ;
Kadir, Mohd. Razali A. ;
Salim, Azizah ;
Ernawati .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (02) :192-+
[7]   APPLICATION OF DELPHI METHOD IN CONSTRUCTION ENGINEERING AND MANAGEMENT RESEARCH: A QUANTITATIVE PERSPECTIVE [J].
Ameyaw, Effah Ernest ;
Hu, Yi ;
Shan, Ming ;
Chan, Albert P. C. ;
Le, Yun .
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2016, 22 (08) :991-1000
[8]  
[Anonymous], 2000, CONSTRUCT MANAGE EC, DOI DOI 10.1080/014461900370799
[9]   Causes of delay in large construction projects [J].
Construction Engineering and Management Department, King Fahd University of Petroleum and Minerals, Box # 680, Dhahran, 31261, Saudi Arabia .
Int. J. Proj. Manage., 2006, 4 (349-357) :349-357
[10]   Climate and construction delays: case study in Chile [J].
Ballesteros-Perez, Pablo ;
Luisa del Campo-Hitschfeld, Maria ;
Alejandro Gonzalez-Naranjo, Manuel ;
Carmen Gonzalez-Cruz, Mari .
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (06) :596-621