Guidelines for the deployment and implementation of manufacturing scheduling systems

被引:26
作者
Framinan, Jose M. [2 ]
Ruiz, Ruben [1 ]
机构
[1] Univ Politecn Valencia, Grp Sistemas Optimizac Aplicada, Inst Tecnol Informat, Valencia 46021, Spain
[2] Univ Seville, Sch Engn, E-41092 Seville, Spain
关键词
scheduling; enterprise integration; enterprise resource planning; DECISION-SUPPORT-SYSTEMS; EXPERT-SYSTEMS; LESSONS; CONSTRAINTS; STEELMAKING;
D O I
10.1080/00207543.2011.564670
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
It has frequently been stated that there exists a gap between production scheduling theory and practice. In order to put theoretical findings into practice, advances in scheduling models and solution procedures should be embedded into a piece of software - a scheduling system - in companies. This results in a process that entails (1) determining its functional features, and (2) adopting a successful strategy for its development and deployment. In this paper we address the latter question and review the related literature in order to identify descriptions and recommendations of the main aspects to be taken into account when developing such systems. These issues are then discussed and classified, resulting in a set of guidelines that can help practitioners during the process of developing and deploying a scheduling system. In addition, identification of these issues can provide some insights to drive theoretical scheduling research towards those topics more in demand by practitioners, and thus help to close the aforementioned gap.
引用
收藏
页码:1799 / 1812
页数:14
相关论文
共 62 条
[1]  
[Anonymous], HUMAN PERFORMANCE PL
[2]  
[Anonymous], INTELLIGENT SCHEDULI
[3]   A visualized human-computer interactive approach to job shop scheduling [J].
Baek, DH ;
Oh, SY ;
Yoon, WC .
INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1999, 12 (01) :75-83
[4]   Creating an expert system for detailed scheduling [J].
Benavides, JAC ;
Prado, JC .
INTERNATIONAL JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2002, 22 (7-8) :806-819
[5]  
Bensana E, 1986, P 1986 IEEE INT C RO, V3,3, P1645
[6]   Human, technological and organizational aspects influencing the production scheduling process [J].
Berglund, M. ;
Karltun, J. .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2007, 110 (1-2) :160-174
[7]   Scheduling hybrid flow shop problem with non-fixed availability constraints [J].
Besbes, Walid ;
Teghem, Jacques ;
Loukil, Taiecir .
EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2010, 4 (04) :413-433
[8]   Learning by objectives for adaptive shop-floor scheduling [J].
Bhattacharyya, S ;
Koehler, GJ .
DECISION SCIENCES, 1998, 29 (02) :347-375
[9]   DEVELOPMENT AND IMPLEMENTATION OF A SCHEDULING SYSTEM FOR A WAFER FABRICATION FACILITY [J].
BITRAN, GR ;
TIRUPATI, D .
OPERATIONS RESEARCH, 1988, 36 (03) :377-395
[10]   PRODUCTION SCHEDULING - PRACTICE AND THEORY [J].
BUXEY, G .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1989, 39 (01) :17-31