Combined Application of Pipe Roof Pre-SUPPORT and Curtain Grouting Pre-Reinforcement in Closely Spaced Large Span Triple Tunnels

被引:10
作者
Li, Ran [1 ]
Zhang, Dingli [1 ]
Wu, Peng [2 ]
Fang, Qian [1 ]
Li, Ao [1 ]
Cao, Liqiang [1 ]
机构
[1] Beijing Jiaotong Univ, Key Lab Urban Underground Engn, Minist Educ, Beijing 100044, Peoples R China
[2] China Highway Engn Consulting Grp Co LTD, Beijing 100088, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2020年 / 10卷 / 09期
基金
中国国家自然科学基金;
关键词
triple tunnels; large span; pipe roof; curtain grouting; field monitoring; numerical simulation; GEOLOGICAL CONDITIONS; SUBSEA TUNNELS; TWIN-TUNNELS; CONSTRUCTION; PERMEABILITY; EXCAVATION;
D O I
10.3390/app10093186
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
The platform of the Badaling Great Wall Underground Station consisted of large span triple tunnels. The triple tunnels passed through several major faults. Based on preliminary in situ monitoring, the interaction behavior among triple tunnels was significantly severe, and the original supports failed to meet the safety requirement. Therefore, pipe roof pre-support (PRPS) and curtain grouting pre-reinforcement (CGPR) were used as the pre-construction techniques. By numerical investigation, the pipe diameter, the arrangement angle of PRPS, and the grouting thickness of CGPR were optimized as 108 mm, 150 degrees, and 3 m, respectively. According to numerical results, PRPS predominantly bore loose rock and reduced mean crown settlement (MCS), while CGPR primarily improved the mechanical properties of rock and decreased the pillar plastic ratio (PPR). PRPS and CGPR had complementary advantages in time, space, and mechanical properties. PRPS could timely form a strong arch structure far ahead of the tunnel face, CGPR could effectively restrict the development of plastic zone. They mutually and actively formed a strong permanent ring in front of the tunnel face. After the field application of PRPS and CGPR, the mean surrounding rock pressure reduced by 33.4%, the MCS reduced by 58.7%, and no support damage was observed. The excavation safety was guaranteed.
引用
收藏
页数:18
相关论文
共 29 条
  • [21] Shi Y. Q., 2014, THESIS
  • [22] Performance Evaluation of Long Pipe Roof for Tunneling below Existing Highway Based on Field Tests and Numerical Analysis: Case Study
    Shi, Yufeng
    Fu, Jinyang
    Yang, Junsheng
    Xu, Changjie
    Geng, Daxin
    [J]. INTERNATIONAL JOURNAL OF GEOMECHANICS, 2017, 17 (09)
  • [23] A review of the Namntall Tunnel project with regard to grouting performance
    Stille, Bjorn
    Gustafson, Gunnar
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2010, 25 (04) : 346 - 356
  • [24] Determination Method of Reasonable Reinforcement Parameters for Subsea Tunnels Considering Ground Reinforcement and Seepage Effect
    Sun, Zhenyu
    Zhang, Dingli
    Fang, Qian
    [J]. APPLIED SCIENCES-BASEL, 2019, 9 (17):
  • [25] Stability analysis and design of stabilization measures for Chenab railway bridge rock slopes
    Tiwari, Gaurav
    Latha, Gali Madhavi
    [J]. BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2020, 79 (02) : 603 - 627
  • [26] Volkmann G.M., 2011, P 14 AUSR TUNN C AUC
  • [27] Grouting techniques for the unfavorable geological conditions of Xiang'an subsea tunnel in China
    Zhang, Dingli
    Fang, Qian
    Lou, Haicheng
    [J]. JOURNAL OF ROCK MECHANICS AND GEOTECHNICAL ENGINEERING, 2014, 6 (05) : 438 - 446
  • [28] Protection of Buildings against Damages as a Result of Adjacent Large-Span Tunneling in Shallowly Buried Soft Ground
    Zhang, Dingli
    Fang, Qian
    Hou, Yanjuan
    Li, Pengfei
    Wong, Louis Ngai Yuen
    [J]. JOURNAL OF GEOTECHNICAL AND GEOENVIRONMENTAL ENGINEERING, 2013, 139 (06) : 903 - 913
  • [29] Load transferring mechanism of pipe umbrella support in shallow-buried tunnels
    Zhang, ZhiQiang
    Li, HuaYun
    Liu, HongYan
    Li, GuangJing
    Shi, XiaoQuan
    [J]. TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2014, 43 : 213 - 221