D3 City project - Economic impact of BIM-assisted design validation

被引:90
作者
Lee, Ghang [1 ]
Park, Harrison Kwangho [1 ]
Won, Jongsung [1 ]
机构
[1] Yonsei Univ, Dept Architectural Engn, Seoul 120749, South Korea
关键词
Building information modeling (BIM); Return on investment (ROI); Design validation;
D O I
10.1016/j.autcon.2011.12.003
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper reports a return-on-investment (ROI) case study of the use of building information modeling (BIM) in "design validation" based on the avoidance costs of rework due to design errors. The ROI was analyzed using the 709 individual design errors found during the BIM design validation of the six high- and medium-rise buildings in the D3 City project in Seoul, Korea. Each design error was categorized according to its cause and the likelihood of detecting it before construction. The likelihood of detecting errors in the ROI analysis made a large difference of a factor of four to fifteen. An additional analysis on the potential impact of design errors on the schedule shows that costs associated with schedule delays has a much larger economic impact than rework costs. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:577 / 586
页数:10
相关论文
共 20 条
[11]  
Krygiel E., 2008, Green BIM: successful sustainable design with building information modeling
[12]   Design Error Classification, Causation, and Prevention in Construction Engineering [J].
Lopez, Robert ;
Love, Peter E. D. ;
Edwards, David J. ;
Davis, Peter R. .
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2010, 24 (04) :399-408
[13]   Divergence or Congruence? A Path Model of Rework for Building and Civil Engineering Projects [J].
Love, Peter E. D. ;
Edwards, David J. ;
Smith, Jim ;
Walker, Derek H. T. .
JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2009, 23 (06) :480-488
[14]   A target benchmark of the impact of three-dimensional parametric modeling in precast construction [J].
Sacks, R ;
Eastman, CM ;
Lee, G ;
Orndorff, D .
PCI JOURNAL, 2005, 50 (04) :126-+
[15]   Process improvements in precast concrete construction using top-down parametric 3-D computer modeling [J].
Sacks, R ;
Eastman, CE ;
Lee, G .
PCI JOURNAL, 2003, 48 (03) :46-55
[16]   Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice [J].
Sacks, Rafael ;
Barak, Ronen .
AUTOMATION IN CONSTRUCTION, 2008, 17 (04) :439-449
[17]  
Suermann P., 2007, Proceedings of the 7th International Conference on Construction Applications of Virtual Reality, P206
[18]   Taxonomy for change causes and effects in construction projects [J].
Sun, Ming ;
Meng, Xianhai .
INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2009, 27 (06) :560-572
[19]  
Young Jr N.W., 2009, BUSINESS VALUE BIM S, P52
[20]  
Young N.W., 2008, SmartMarket Report, P48