D3 City project - Economic impact of BIM-assisted design validation

被引:90
作者
Lee, Ghang [1 ]
Park, Harrison Kwangho [1 ]
Won, Jongsung [1 ]
机构
[1] Yonsei Univ, Dept Architectural Engn, Seoul 120749, South Korea
关键词
Building information modeling (BIM); Return on investment (ROI); Design validation;
D O I
10.1016/j.autcon.2011.12.003
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper reports a return-on-investment (ROI) case study of the use of building information modeling (BIM) in "design validation" based on the avoidance costs of rework due to design errors. The ROI was analyzed using the 709 individual design errors found during the BIM design validation of the six high- and medium-rise buildings in the D3 City project in Seoul, Korea. Each design error was categorized according to its cause and the likelihood of detecting it before construction. The likelihood of detecting errors in the ROI analysis made a large difference of a factor of four to fifteen. An additional analysis on the potential impact of design errors on the schedule shows that costs associated with schedule delays has a much larger economic impact than rework costs. (C) 2011 Elsevier B.V. All rights reserved.
引用
收藏
页码:577 / 586
页数:10
相关论文
共 20 条
[1]  
[Anonymous], SIMTECT 2007 SIM C S
[2]  
Autodesk, 2007, REV BUILD INF MOD, P5
[3]  
Becerik-Gerber B, 2010, J INF TECHNOL CONSTR, V15, P185
[4]  
CIFE, 2005, CAS STUD IMPL BEN 3D
[5]  
Eastman C., 2008, BIM HDB GUIDE BUILDI, P504
[6]  
GIEL B., 2010, The International Conference on Computing in Civil and Building Engineering (ICCCBE), Nottingham, P153
[7]  
Gilligan B., 2007, VDC USE 2007 SIGNIFI, P40
[8]   Case study and statistical analysis of utility conflicts on construction roadway projects and best practices in their avoidance [J].
Goodrum, Paul ;
Smith, Adam ;
Slaughter, Ben ;
Kari, Fady .
JOURNAL OF URBAN PLANNING AND DEVELOPMENT-ASCE, 2008, 134 (02) :63-70
[9]  
Khemlani L, 2006, 2 ANN BIM AWARDS 1
[10]  
Khemlani L, 2007, 3 ANN BIM AWARDS