Joint cell loading and scheduling approach to cellular manufacturing systems

被引:9
作者
Akturk, M. Selim [1 ]
机构
[1] Bilkent Univ, Dept Ind Engn, TR-06800 Ankara, Turkey
关键词
cell scheduling; production planning; cellular manufacture; linear programming; PERFORMANCE EVALUATION; ALGORITHMS; RULES; TIMES;
D O I
10.1080/00207543.2010.532165
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
A hierarchical multi-objective heuristic algorithm and pricing mechanism are developed to first determine the cell loading decisions, and then lot sizes for each item and to obtain a sequence of items comprising the group technology families to be processed at each manufacturing cell that minimise the setup, inventory holding, overtime and tardiness costs simultaneously. The linkage between the different levels is achieved using the proposed pricing mechanism through a set of dual variables associated with the resource and inventory balance constraints, and the feasibility status feedback information is passed between the levels to ensure internally consistent decisions. The computational results indicate that the proposed algorithm is very efficient in finding a compromise solution for a set of randomly generated problems compared with a set of competing algorithms.
引用
收藏
页码:6321 / 6341
页数:21
相关论文
共 24 条
[1]   Management of product variety in cellular manufacturing systems [J].
Akturk, MS ;
Yayla, HM .
INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2005, 17 (02) :93-117
[2]   A review of scheduling research involving setup considerations [J].
Allahverdi, A ;
Gupta, JND ;
Aldowaisan, T .
OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02) :219-239
[3]   A survey of scheduling problems with setup times or costs [J].
Allahverdi, Ali ;
Ng, C. T. ;
Cheng, T. C. E. ;
Kovalyov, Mikhail Y. .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) :985-1032
[4]  
[Anonymous], 1971, AIIE T, DOI DOI 10.1080/05695557108974812
[5]  
[Anonymous], 2009, PRINCIPLES SEQUENCIN, DOI DOI 10.1002/9780470451793
[6]   Scheduling parallel machines to minimize weighted flowtime with family set-up times [J].
Azizoglu, M ;
Webster, S .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (06) :1199-1215
[7]  
Baker KR, 1999, NAV RES LOG, V46, P978, DOI 10.1002/(SICI)1520-6750(199912)46:8<978::AID-NAV7>3.0.CO
[8]  
2-D
[9]  
Biggs J. R., 1979, Decision Sciences, V10, P96, DOI 10.1111/j.1540-5915.1979.tb00010.x
[10]   Performance evaluation of family-based dispatching in small manufacturing cells [J].
Bokhorst, J. A. C. ;
Nomden, G. ;
Slomp, J. .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2008, 46 (22) :6305-6321