Simulation-Based Auction Protocol for Resource Scheduling Problems

被引:22
作者
Taghaddos, H. [1 ]
AbouRizk, S. [2 ]
Mohamed, Y. [2 ]
Hermann, U. [1 ]
机构
[1] PCL Ind Management Inc, Construct Engn, Edmonton, AB T6E 3P4, Canada
[2] Univ Alberta, Dept Civil & Environm Engn, Edmonton, AB T6G 2W2, Canada
基金
加拿大自然科学与工程研究理事会;
关键词
Resource scheduling; Simulation; Multiagent; Auction protocol; Combinatorial algorithms; Crane allocation; GENETIC ALGORITHM; CONSTRUCTION; ALLOCATION; MODELS;
D O I
10.1061/(ASCE)CO.1943-7862.0000399
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Resource scheduling, or the allocation of resources over time, is a challenging problem in large-scale or multiple-project environments. Traditional network scheduling techniques are ineffective in modeling the dynamic nature and resource interactions of large or multiunit projects. This paper presents a simulation-based auction protocol (SBAP) to solve resource scheduling problems in large-scale construction projects. SBAP is a hybrid framework that integrates multi agent resource allocation (MARA) in a simulation environment. SBAP deploys a centralized resource allocation approach, referred to as an auction protocol, whereby agents bid on different combinations of resources at the start of a simulation cycle. Agents attempt to improve their individual welfare by acquiring a combination of resources; an auctioneer looks at the entire system and allocates resources to the agents using a combinatorial algorithm to maximize an overall objective function (e.g., maximizing the system's revenue or minimizing total costs). The auction is repeated on a regular basis. Simulation is also employed in large-scale projects to track the availability of resources, capture and release the resources, and satisfy constraints of the problem. This paper demonstrates the architecture of the SBAP framework and discusses implementation of SBAP in a real case study of crane allocation in an industrial project. DOI: 10.1061/(ASCE)CO.1943-7862.0000399. (C) 2012 American Society of Civil Engineers.
引用
收藏
页码:31 / 42
页数:12
相关论文
共 50 条
  • [21] Conceptual frame for development of optimized simulation-based scheduling systems
    Jeong, KY
    EXPERT SYSTEMS WITH APPLICATIONS, 2000, 18 (04) : 299 - 306
  • [22] Using workflow for reconfigurable simulation-based planning and scheduling system
    Lee, Ho Yeoul
    Choi, Byoung Kyu
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2011, 24 (02) : 171 - 187
  • [23] Simulation-Based Approach for Lookahead Scheduling of Onshore Wind Projects Subject to Weather Risk
    Mohamed, Emad
    Jafari, Parinaz
    Chehouri, Adam
    AbouRizk, Simaan
    SUSTAINABILITY, 2021, 13 (18)
  • [24] Simulation and Optimisation Based Approach for Job Shop Scheduling Problems
    Kulkarni, Pooja
    Venkateswaran, Jayendran
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 360 - 364
  • [25] Simulation-based scheduling of module assembly yards: case study
    Mohamed, Yasser
    Borrego, Davila
    Francisco, Luis
    Al-Hussein, Mohamed
    AbouRizk, Simaan
    Hermann, Ulrich
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2007, 14 (03) : 293 - +
  • [26] The parcel hub scheduling problem: A simulation-based solution approach
    McWilliams, DL
    Stanfield, PM
    Geiger, CD
    COMPUTERS & INDUSTRIAL ENGINEERING, 2005, 49 (03) : 393 - 412
  • [27] SIMULATION-BASED OVERHEAD-CRANE SCHEDULING FOR A MANUFACTURING PLANT
    Zhang, Tao
    Rose, Oliver
    2013 WINTER SIMULATION CONFERENCE (WSC), 2013, : 2633 - 2642
  • [28] A concept for simulation-based optimization in Vehicle Routing Problems
    Mazzuco, D. E.
    Carreirao Danielli, A. M.
    Oliveira, D. L.
    Santos, P. P. P.
    Pereira, M. M.
    Coelho, L. C.
    Frazzon, E. M.
    IFAC PAPERSONLINE, 2018, 51 (11): : 1720 - 1725
  • [29] Resource scheduling in cloud-based manufacturing system: a comprehensive survey
    Rashidifar, Rasoul
    Bouzary, Hamed
    Chen, F. Frank
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2022, 122 (11-12) : 4201 - 4219
  • [30] Simulation-based solution for a dynamic multi-crane-scheduling problem in a steelmaking shop
    Li, Ji
    Xu, Anjun
    Zang, Xuesong
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2020, 58 (22) : 6970 - 6984