Efficient Scheduling of Batch Plants Using Reachability Tree Search for Timed Automata with Lower Bound Computations

被引:0
|
作者
Subbiah, Subanatarajan [1 ]
Schoppmeyer, Christian [1 ]
Engell, Sebastian [1 ]
机构
[1] Tech Univ Dortmund, Dept Biochem & Chem Engn, Proc Dynam & Operat Grp, D-44227 Dortmund, Germany
来源
21ST EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING | 2011年 / 29卷
关键词
Batch scheduling; branch-and-bound; timed automata; reachability analysis;
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
In this paper we discuss an extension of a recent approach to solve batch scheduling problems using reachability analysis for timed automata (TA) by embedding lower bound computations in the reachability algorithm. We propose an extension of the embedded LP-formulation to handle scheduling problems with NIS policy and an improved minimum remaining processing time (MRPT) procedure to compute the lower bounds. The proposed bounding procedures are tested on typical batch scheduling problems. The comparative study shows that the MRPT-based bounding procedure is efficient and increases the overall performance significantly in comparison to the LP-based bounding procedure.
引用
收藏
页码:930 / 934
页数:5
相关论文
共 6 条
  • [1] Scheduling of multi-product batch plants using reachability analysis of timed automata models
    Subbiah, Subanatarajan
    Panek, Sebastian
    Engell, Sebastian
    Stursberg, Olaf
    ICINCO 2007: PROCEEDINGS OF THE FOURTH INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS, VOL ICSO: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2007, : 141 - +
  • [2] Batch Scheduling With Intermediate Due Dates Using Timed Automata Models
    Subbiah, Subanatarajan
    Tometzki, Thomas
    Engell, Sebastian
    18TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2008, 25 : 151 - 156
  • [3] Scheduling of multi-product batch plants based upon timed automata models
    Panek, Sebastian
    Engell, Sebastian
    Subbiah, Subanatarajan
    Stursberg, Olaf
    COMPUTERS & CHEMICAL ENGINEERING, 2008, 32 (1-2) : 275 - 291
  • [4] Short-Term Scheduling of Multi-Product Batch Plants with Sequence-Dependent Changeovers Using Timed Automata Models
    Subbiah, Subanatarajan
    Engell, Sebastian
    20TH EUROPEAN SYMPOSIUM ON COMPUTER AIDED PROCESS ENGINEERING, 2010, 28 : 1201 - 1206
  • [5] Multi-product batch scheduling with intermediate due dates using priced timed automata models
    Subbiah, Subanatarajan
    Tometzki, Thomas
    Panek, Sebastian
    Engell, Sebastian
    COMPUTERS & CHEMICAL ENGINEERING, 2009, 33 (10) : 1661 - 1676
  • [6] Modeling and Solving Batch Scheduling Problems with Various Storage Policies and Operational Policies using Timed Automata
    Schoppmeyer, Christian
    Subbiah, Subanatarajan
    Engell, Sebastian
    11TH INTERNATIONAL SYMPOSIUM ON PROCESS SYSTEMS ENGINEERING, PTS A AND B, 2012, 31 : 635 - 639