Multi-Stage Stochastic Electrification Planning under Demand Uncertainty

被引:0
|
作者
Chen, Yuang [1 ]
Basciftci, Beste [2 ]
Thomas, Valerie M. [1 ]
机构
[1] Georgia Inst Technol, Ind & Syst Engn, Atlanta, GA 30332 USA
[2] Univ Iowa, Dept Business Analyt, Iowa City, IA USA
关键词
Sub-Saharan African countries; electrification planning; demand uncertainty; multi-stage stochastic program; OPTIMIZATION MODEL; GENERATION;
D O I
10.1109/PowerAfrica53997.2022.9905247
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A novel multi-stage stochastic electrification planning model for Sub-Saharan African countries is developed by involving both centralized and decentralized infrastructure, considering future demand uncertainty. A case study of Rwanda shows that for projected annual demand increase rates ranging from 4% to 7% from 2022 to 2028, a deterministic production planning model costs US$1.94B and can result in 25% underbuilt to 49% overbuilt; a two-stage stochastic model reduces over- and under-build risks and costs an expected US $2.09B; the multistage stochastic electrification model also reduces risks and costs US$1.97, a 6% reduction compared to the two-stage model.
引用
收藏
页码:85 / 89
页数:5
相关论文
共 50 条
  • [31] An Uncertainty-Based Random Boundary Interval Multi-Stage Stochastic Programming for Water Resources Planning
    Mehri Raei
    Javad Hossienzad
    Mohammad Ali Ghorbani
    Water Resources Management, 2023, 37 : 4571 - 4587
  • [32] Water resources management under uncertainty: factorial multi-stage stochastic program with chance constraints
    X. M. Liu
    G. H. Huang
    S. Wang
    Y. R. Fan
    Stochastic Environmental Research and Risk Assessment, 2016, 30 : 945 - 957
  • [33] Bulk ship fleet renewal and deployment under uncertainty: A multi-stage stochastic programming approach
    Arslan, Ayse N.
    Papageorgiou, Dimitri J.
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 97 : 69 - 96
  • [34] An Uncertainty-Based Random Boundary Interval Multi-Stage Stochastic Programming for Water Resources Planning
    Raei, Mehri
    Hossienzad, Javad
    Ghorbani, Mohammad Ali
    WATER RESOURCES MANAGEMENT, 2023, 37 (12) : 4571 - 4587
  • [35] Multi-stage Rolling Stochastic Planning of Regional Integrated Energy System Considering Dual-uncertainty
    Lei Y.
    Zhao J.
    Ding S.
    Jia H.
    Wang D.
    Guo X.
    Dianli Xitong Zidonghua/Automation of Electric Power Systems, 2023, 47 (20): : 53 - 63
  • [36] Novel Multi-Stage Stochastic DG Investment Planning with Recourse
    Santos, Sergio F.
    Fitiwi, Desta Zahlay
    Bizuayehu, Abebe Worke
    Shafie-khah, Miadreza
    Asensio, Miguel
    Contreras, Javier
    Pereira Cabrita, Carlos Manuel
    Catalao, Joao P. S.
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2017, 8 (01) : 164 - 178
  • [37] Supply chain planning using multi-stage stochastic programming
    Nagar, Lokesh
    Jain, Karuna
    SUPPLY CHAIN MANAGEMENT-AN INTERNATIONAL JOURNAL, 2008, 13 (03) : 251 - 256
  • [38] A multi-objective multi-stage stochastic model for project team formation under uncertainty in time requirements
    Rahmanniyay, Fahimeh
    Yu, Andrew Junfang
    Seif, Javad
    COMPUTERS & INDUSTRIAL ENGINEERING, 2019, 132 : 153 - 165
  • [39] A Multi-Stage Stochastic Non-Linear Model for Reactive Power Planning Under Contingencies
    Lopez, Julio Cesar
    Contreras, Javier
    Munoz, Jose I.
    Mantovani, J. R. S.
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2013, 28 (02) : 1503 - 1514
  • [40] Multi-stage multi-objective power expansion planning with fault uncertainty
    Xu Y.
    Zhang J.
    Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2021, 42 (12): : 443 - 451