Multi-Stage Stochastic Electrification Planning under Demand Uncertainty

被引:0
|
作者
Chen, Yuang [1 ]
Basciftci, Beste [2 ]
Thomas, Valerie M. [1 ]
机构
[1] Georgia Inst Technol, Ind & Syst Engn, Atlanta, GA 30332 USA
[2] Univ Iowa, Dept Business Analyt, Iowa City, IA USA
关键词
Sub-Saharan African countries; electrification planning; demand uncertainty; multi-stage stochastic program; OPTIMIZATION MODEL; GENERATION;
D O I
10.1109/PowerAfrica53997.2022.9905247
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
A novel multi-stage stochastic electrification planning model for Sub-Saharan African countries is developed by involving both centralized and decentralized infrastructure, considering future demand uncertainty. A case study of Rwanda shows that for projected annual demand increase rates ranging from 4% to 7% from 2022 to 2028, a deterministic production planning model costs US$1.94B and can result in 25% underbuilt to 49% overbuilt; a two-stage stochastic model reduces over- and under-build risks and costs an expected US $2.09B; the multistage stochastic electrification model also reduces risks and costs US$1.97, a 6% reduction compared to the two-stage model.
引用
收藏
页码:85 / 89
页数:5
相关论文
共 50 条
  • [21] On a Multi-stage Stochastic Programming Model for Inventory Planning
    Huang, Kai
    Ahmed, Shabbir
    INFOR, 2008, 46 (03) : 155 - 163
  • [22] Financial planning via multi-stage stochastic optimization
    Mulvey, JM
    Shetty, B
    COMPUTERS & OPERATIONS RESEARCH, 2004, 31 (01) : 1 - 20
  • [23] A multi-stage stochastic transmission expansion planning method
    Akbari, Tohid
    Rahimikian, Ashkan
    Kazemi, Ahad
    ENERGY CONVERSION AND MANAGEMENT, 2011, 52 (8-9) : 2844 - 2853
  • [24] Development of an interval multi-stage stochastic programming model for regional energy systems planning and GHG emission control under uncertainty
    Li, Gongchen
    Huang, Guohe
    Lin, Qianguo
    Cai, Yanpeng
    Chen, Yumin
    Zhang, Xiaodong
    INTERNATIONAL JOURNAL OF ENERGY RESEARCH, 2012, 36 (12) : 1161 - 1174
  • [25] Optimal procurement and production planning for multi-product multi-stage production under yield uncertainty
    Talay, Isilay
    Ozdemir-Akyildirim, Oznur
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2019, 275 (02) : 536 - 551
  • [26] Multi-Stage Robust Dispatch Considering Demand Response Under Decision-Dependent Uncertainty
    Su, Yifan
    Liu, Feng
    Wang, Zhaojian
    Zhang, Yunfan
    Li, Boda
    Chen, Yue
    IEEE TRANSACTIONS ON SMART GRID, 2023, 14 (04) : 2786 - 2797
  • [27] Chance-constrained multi-stage stochastic energy system expansion planning with demand satisfaction flexibility
    Chen, Yuang
    Basciftci, Beste
    Thomas, Valerie M.
    INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2024, 155
  • [28] The Value of Multi-Stage Stochastic Programming in Risk-Averse Unit Commitment Under Uncertainty
    Mahmutogullari, Ali Irfan
    Ahmed, Shabbir
    Cavus, Ozlem
    Akturk, M. Selim
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2019, 34 (05) : 3667 - 3676
  • [29] Multi-stage stochastic optimization framework for power generation system planning integrating hybrid uncertainty modelling
    Ioannou, Anastasia
    Fuzuli, Gulistiani
    Brennan, Feargal
    Yudha, Satya Widya
    Angus, Andrew
    ENERGY ECONOMICS, 2019, 80 : 760 - 776
  • [30] Water resources management under uncertainty: factorial multi-stage stochastic program with chance constraints
    Liu, X. M.
    Huang, G. H.
    Wang, S.
    Fan, Y. R.
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2016, 30 (03) : 945 - 957