Hierarchies of adaptable learning during product development

被引:0
作者
Chatzimichali, Anna P. [1 ]
Tourassis, Vassilios D. [2 ]
机构
[1] Maastricht Univ, Sch Business & Econ, Dept Educ Res & Dev, Maastricht, Netherlands
[2] Democritus Univ Thrace, Fac Engn, Prod Engn & Management Dept, Xanthi, Greece
来源
2011 IEEE INTERNATIONAL CONFERENCE ON SYSTEMS, MAN, AND CYBERNETICS (SMC) | 2011年
关键词
Ramp-up; New Product Development; Learning curve; QUALITY; DESIGN; IMPROVEMENT; CURVE;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Shorter product lifecycles, shrinking time-to-market and increasing global competition, drive companies to premature transitions from the development laboratory to full-scale commercial production. This ramp-up period is usually considered as a transient phenomenon and often ignored by a large body of literature. Hence, the current push for accelerated development and quality manufacturing of new products, has increased the need to model and measure production performance during ramp-up. Despite this need for a concrete framework of these early stages of the product life cycle, a useful model of ramp-up, formalizing this tradeoff between product design and process modeling during the execution phase, is missing. In this context the present work deals with this issue throught a structured methodology that highlights the system sensitivities by decoupling process and product design, proposing an algorithm that uses empirical evaluation measures of manufacturing complexity.
引用
收藏
页码:458 / 464
页数:7
相关论文
共 35 条
[1]   BEHIND THE LEARNING-CURVE - A SKETCH OF THE LEARNING-PROCESS [J].
ADLER, PS ;
CLARK, KB .
MANAGEMENT SCIENCE, 1991, 37 (03) :267-281
[2]  
[Anonymous], 2000, Simulation modeling and analysis
[3]   ANALYSIS OF ASSEMBLY OPERATIONS DIFFICULTY - A FUZZY EXPERT-SYSTEM APPROACH [J].
BENARIEH, D .
JOURNAL OF INTELLIGENT MANUFACTURING, 1993, 4 (06) :411-419
[4]  
Brooker J. D., 2005, J ENG DESIGN, V16, P279
[5]   CAUSES OF QUALITY DEVIATIONS IN DESIGN AND CONSTRUCTION [J].
BURATI, JL ;
FARRINGTON, JJ ;
LEDBETTER, WB .
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1992, 118 (01) :34-49
[6]   Investing in product development and production capabilities: The crucial linkage between time-to-market and ramp-up time [J].
Carrillo, JE ;
Franza, RM .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2006, 171 (02) :536-556
[7]  
Casamento J. W., 1992, THESIS MIT
[8]   Managing learning resources for consecutive product generations [J].
Demeester, LL ;
Qi, M .
INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2005, 95 (02) :265-283
[9]  
Fujimoto T., 1993, COMPARING PERFORMANC
[10]  
Gabriel T. J., 2008, SE DEC SCI I C 20 22, P614