d Investigatins the impact of using PMIS in resource management on cost of projects as a conceptual model in construction projects

被引:0
作者
Mosavi, Seyed Karim [1 ]
Hosseini, Azim [1 ]
Vosoughifar, Hamid Reza [1 ]
Barandoust, Rambood [2 ]
Mohammadi, Ghodratollah [3 ]
机构
[1] Islamic Azad Univ, Dept Civil Engn, South Tehran Branch, Tehran, Iran
[2] Islamic Azad Univ, Dept Ind Management, Imam Khomeini Mem Branch, Tehran, Iran
[3] Islamic Azad Univ, Dept Min Engn, South Tehran Branch, Tehran, Iran
来源
NEXO REVISTA CIENTIFICA | 2022年 / 35卷 / 02期
关键词
PMIS; Cost management; Construction projects; Conceptual model;
D O I
10.5377/nexo.v35i02.14640
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The Project Management Information System (PMIS) is a powerful tool in project management discussions due to its many benefits. Improper deployment of a PMIS and disregard for its qualitative factors influencing project success will never lead to the achievement of project goals. The purpose of this study was to investigate the impact of using PMIS on the cost management of construction projects that have used this information system. In this study, the impact of PMIS quality factors such as project quality, level of implementation technology, level of design skills, teamwork coefficient and execution time on project cost management was evaluated. The statistical population is the questionnaire of projects implemented through PMIS in construction projects, based on which 100 questionnaires were distributed among the projects and then collected. In this study, structural equation modeling has been used to investigate the research hypotheses. In this regard, "SPSS" software was used. The results of this study indicate that system quality, information quality and service quality have a positive effect on project success in terms of cost management.
引用
收藏
页码:601 / 610
页数:10
相关论文
共 50 条
  • [41] A novel model for risk management of outsourced construction projects using decision-making methods: a case study
    Mahmoudi, Amin
    Abbasi, Mehdi
    Deng, Xiaopeng
    Ikram, Muhammad
    Yeganeh, Salman
    GREY SYSTEMS-THEORY AND APPLICATION, 2020, 10 (02) : 97 - 123
  • [42] Development of time–cost trade-off optimization model for construction projects with MOPSO technique
    Agarwal A.K.
    Chauhan S.S.
    Sharma K.
    Sethi K.C.
    Asian Journal of Civil Engineering, 2024, 25 (6) : 4529 - 4539
  • [43] Developing A Model For Risk and Responsibility Management Share Amongst Stakeholders Consortium in Construction Projects
    Ghaffari, Alireza
    ADVANCES IN APPLIED MATERIALS AND ELECTRONICS ENGINEERING II, 2013, 684 : 639 - 643
  • [44] Development of a Conceptual Integrated Influential Factors (IIF) Model of Internal Stakeholder for Construction Projects Successful Completion in Yemen
    Al-Fadhali, Najib
    Zainal, Rozlin
    Kim-Soon, Ng
    Hasaballah, Abdel Hafiez Ali
    Ahmad, Abd Rahman
    ADVANCED SCIENCE LETTERS, 2018, 24 (05) : 2979 - 2984
  • [45] Cost Risk Assessment of Construction Projects Based on Entropy-weighted Matter-element Model
    Xie, Minghui
    Yang, Ying
    ADVANCES IN BUILDING MATERIALS, PTS 1-3, 2011, 168-170 : 2402 - +
  • [46] Uncertainty management in time estimation of construction projects: A systematic literature review and new model development
    Naderpour, A.
    Sardroud, J. Majrouhi
    Mofid, M.
    Xenidis, Y.
    Rostam, T. Pour
    SCIENTIA IRANICA, 2019, 26 (02) : 752 - 778
  • [47] Examining the Impact of Social Media Use on Project Management Performance: Evidence from Construction Projects in China
    Ma, Guofeng
    Jia, Jianyao
    Ding, Jiyong
    Wu, Ming
    Wang, Ding
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (03)
  • [48] Supporting Partnering Relation Management in the Implementation of Construction Projects Using AHP and Fuzzy AHP Methods
    Radziszewska-Zielina, Elzbieta
    Szewczyk, Bartlomiej
    WORLD MULTIDISCIPLINARY CIVIL ENGINEERING-ARCHITECTURE-URBAN PLANNING SYMPOSIUM 2016, WMCAUS 2016, 2016, 161 : 1096 - 1100
  • [49] Managing concurrent construction projects using knowledge management and set-based thinking.
    Belay, Alemu Moges
    Torp, Olav
    Thodesen, Carl
    5TH CREATIVE CONSTRUCTION CONFERENCE (CCC 2016), 2016, 164 : 235 - 242
  • [50] Risk Assessment of Ex-Post Transaction Cost in Construction Projects Using Structural Equation Modeling
    Ali, Zaigham
    Zhu, Fangwei
    Hussain, Shahid
    SUSTAINABILITY, 2018, 10 (11)