共 51 条
[31]
Data-driven analysis of "corporate risks" using historical cost-control data
[J].
JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE,
1998, 124 (01)
:42-47
[32]
MOAVENZADEH F, 1991, CONSTR BUSINESS MAR, P25
[33]
NEWMAN CM, 1981, MANAGING EVALUATING
[34]
NIELSEN KR, 1997, INT CONSTRUCTION L 2, P188
[35]
NOLL RG, 1990, J LEGAL STUD, V19, P2
[36]
OCK JH, 1998, THESIS U COLORADO BO
[37]
POULIQUEN LY, 1970, 11 WORLD BANK
[38]
SHAFER G, 1990, READINGS UNCERTAINTY
[39]
TANAKA K, 1984, THESIS COLORADO SCH
[40]
*UNESCO, 1984, PROJ EV PROBL METH