DEVELOPING AN UNCERTAINTY ANALYSIS MODEL FOR OFF-SITE BUILDING PRODUCTION

被引:0
作者
Arashpour, Mehrdad [1 ]
Wakefield, Ron [1 ]
机构
[1] RMIT Univ, Sch Property Construct & Project Management, Melbourne, Vic, Australia
来源
IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT | 2015年
关键词
Construction management; Delays and rework; Hybrid projects; Plan reliability; Simulation and optimization; Site built processes; Workflow analysis; PROJECT-MANAGEMENT; OPTIMIZATION; FRAMEWORK;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The hybrid use of off-site and on-site processes in construction projects has increased significantly over the past decade. The analysis and management of uncertainty in hybrid projects is not a trivial task as workflow variability in off-site and on-site operations can interact and amplify one another. The aim of this paper is to analyze various drivers of uncertainty such as high levels of project complexity, risk seeking behaviors, unavailability of resources, and combined variability in hybrid projects. Production data of two Australian construction companies were collected and utilized in modeling uncertainty. Findings show the significant effect of uncertainty drivers on project plan reliability and the necessity of an adequate uncertainty analysis and management in hybrid projects. The results of this study enhance the knowledge about management of hybrid projects and have the potential to improve the way construction companies deal with uncertainty in project environments.
引用
收藏
页码:1121 / 1125
页数:5
相关论文
共 23 条
  • [1] Complex project management as complex problem solving: A distributed knowledge management perspective
    Ahern, Terence
    Leavy, Brian
    Byrne, P. J.
    [J]. INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (08) : 1371 - 1381
  • [2] Arashpour M., CIB WORLD BUILD C 20
  • [3] Arashpour M., 2013, RES DEV PRACTICE STR
  • [4] A New Approach for Modelling Variability in Residential Construction Projects
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Lee, Eric Wai Ming
    [J]. CONSTRUCTION ECONOMICS AND BUILDING, 2013, 13 (02): : 83 - 92
  • [5] Arashpour M, 2012, CONSTR ECON BUILD, V12, P1
  • [6] Autonomous production tracking for augmenting output in off-site construction
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Maqsood, Tayyab
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 53 : 13 - 21
  • [7] Optimization of process integration and multi-skilled resource utilization in off-site construction
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Minas, James
    [J]. AUTOMATION IN CONSTRUCTION, 2015, 50 : 72 - 80
  • [8] Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Lee, E. W. M.
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2014, 41 (12) : 995 - 1004
  • [9] Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects
    Arashpour, Mehrdad
    Wakefield, Ron
    Blismas, Nick
    Lee, E. W. M.
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (02)
  • [10] Analysis of Workflow Variability and Its Impacts on Productivity and Performance in Construction of Multistory Buildings
    Arashpour, Mohammadreza
    Arashpour, Mehrdad
    [J]. JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (06)