Business cycle durations

被引:106
作者
Filardo, AJ [1 ]
Gordon, SF
机构
[1] Fed Reserve Bank, Kansas City, MO 64198 USA
[2] Univ Laval, Dept Econ, Quebec City, PQ G1K 7P4, Canada
[3] Univ Laval, CREFA, Quebec City, PQ G1K 7P4, Canada
关键词
business cycles; Markov switching; conditional expected durations; Gibbs sampling; probit model;
D O I
10.1016/S0304-4076(97)00096-1
中图分类号
F [经济];
学科分类号
02 ;
摘要
While the development of Markov switching extensions to time series modeling has provided a useful way of characterizing business cycle dynamics, these models are not without their weaknesses. One problem is posed by the fact that since the state space for the unobserved state variables grows with the sample size, sampling distributions for maximum-likelihood estimates are difficult to establish. A second problem is that since the transition probabilities are constant, the conditional expected duration of a phase is constant. This paper extends the model so that the information contained in leading indicator data can be used to forecast transition probabilities. These transition probabilities can then be used to calculate expected durations. The model is applied to US data to evaluate its ability to explain observed business cycle durations. The technical problems encountered with classical techniques are avoided by using Bayesian methods. Gibbs sampling techniques are used to calculate expected posterior durations. (C) 1998 Elsevier Science S.A. All rights reserved.
引用
收藏
页码:99 / 123
页数:25
相关论文
共 50 条
  • [41] Business Cycle Correspondence in the European Union
    Andrew P. Dickerson
    Heather D. Gibson
    Euclid Tsakalotos
    Empirica, 1998, 25 (1) : 49 - 75
  • [42] Dynamics of sectoral business cycle comovement
    Sandqvist, Anna Pauliina
    APPLIED ECONOMICS, 2017, 49 (47) : 4742 - 4759
  • [43] Layoffs and lemons over the business cycle
    Nakamura, Emi
    ECONOMICS LETTERS, 2008, 99 (01) : 55 - 58
  • [44] Uncertainty shocks and business cycle research
    Fernandez-Villaverde, Jesus
    Guerron-Quintana, Pablo A.
    REVIEW OF ECONOMIC DYNAMICS, 2020, 37 : S118 - S146
  • [45] Regional business cycle synchronization in Europe?
    Lourdes Acedo Montoya
    Jakob de Haan
    International Economics and Economic Policy, 2008, 5 (1-2) : 123 - 137
  • [46] Business cycle uncertainty and economic welfare
    Cho, Jang-Ok
    Cooley, Thomas F.
    Kim, Hyung Seok E.
    REVIEW OF ECONOMIC DYNAMICS, 2015, 18 (02) : 185 - 200
  • [47] Business cycle analysis and VARMA models
    Kascha, Christian
    Mertens, Karel
    JOURNAL OF ECONOMIC DYNAMICS & CONTROL, 2009, 33 (02) : 267 - 282
  • [48] Asset prices, credit and the business cycle
    Chen, Xiaoshan
    Kontonikas, Alexandros
    Montagnoli, Alberto
    ECONOMICS LETTERS, 2012, 117 (03) : 857 - 861
  • [49] Wage dispersion over the business cycle
    Morin, Annaig
    ECONOMICS LETTERS, 2019, 181 : 17 - 21
  • [50] Commodity markets through the business cycle
    Chevallier, Julien
    Gatumel, Mathieu
    Ielpo, Florian
    QUANTITATIVE FINANCE, 2014, 14 (09) : 1597 - 1618