Measuring willingness to pay for reliable electricity: Evidence from Senegal

被引:23
作者
Deutschmann, Joshua W. [1 ]
Postepska, Agnieszka [2 ]
Sarr, Leopold [3 ]
机构
[1] Univ Wisconsin, Madison, WI 53706 USA
[2] Univ Groningen, Groningen, Netherlands
[3] SMJData, Fairfax, VA USA
关键词
Willingness to pay; Contingent valuation; DCm; Unique valuation assumption; CONTINGENT-VALUATION; DICHOTOMOUS CHOICE; RURAL ELECTRIFICATION; DEVELOPING-COUNTRIES; SANITATION SERVICES; ENERGY EVIDENCE; POWER OUTAGES; WATER; QUALITY; HOUSEHOLDS;
D O I
10.1016/j.worlddev.2020.105209
中图分类号
F0 [经济学]; F1 [世界各国经济概况、经济史、经济地理]; C [社会科学总论];
学科分类号
0201 ; 020105 ; 03 ; 0303 ;
摘要
Low-quality electricity service constitutes a significant obstacle in achieving sustainable development. Governments in low-income countries and donors are increasingly seeking to invest in improving electricity service quality and reliability. Understanding households' and firms' willingness to pay (WTP) for quality improvements is key to designing investments in the electricity sector. In this paper, we provide new evidence on WTP for service quality improvements from a nationally-representative survey in Senegal. We find that households and firms are willing to pay a premium over current tariffs for high-quality electricity service without outages. However, WTP for marginal service improvements is significantly lower than WTP for uninterrupted service, suggesting that, for households and firms, any increase in electricity tariff must be accompanied by substantial quality improvements. We discuss the multi-round bidding game built in our data to emphasize the importance of design choices in eliciting the WTP and draw some policy implications. (C) 2020 The Author(s). Published by Elsevier Ltd.
引用
收藏
页数:16
相关论文
共 67 条
  • [1] Willingness to pay for renewable energy: Evidence from a contingent valuation survey in Kenya
    Abdullah, Sabah
    Jeanty, P. Wilner
    [J]. RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2011, 15 (06) : 2974 - 2983
  • [2] Choice experiment study on the willingness to pay to improve electricity services
    Abdullah, Sabah
    Mariel, Petr
    [J]. ENERGY POLICY, 2010, 38 (08) : 4570 - 4581
  • [3] Electricity Cost and Firm Performance: Evidence from India
    Abeberese, Ama Baafra
    [J]. REVIEW OF ECONOMICS AND STATISTICS, 2017, 99 (05) : 839 - 852
  • [4] A choice experiment on the willingness of households to accept power outages
    Abrate, Graziano
    Bruno, Clementina
    Erbetta, Fabrizio
    Fraquelli, Giovanni
    Lorite-Espejo, Azahara
    [J]. UTILITIES POLICY, 2016, 43 : 151 - 164
  • [5] Cross-subsidies for improved sanitation in low income settlements: Assessing the willingness to pay of water utility customers in Kenyan cities
    Acey, Charisma
    Kisiangani, Joyce
    Ronoh, Patrick
    Delaire, Caroline
    Makena, Evelyn
    Norman, Guy
    Levine, David
    Khush, Ranjiv
    Peletz, Rachel
    [J]. WORLD DEVELOPMENT, 2019, 115 : 160 - 177
  • [6] Adenike A.A., 2009, RES J SOCIAL SCI PAG, P6
  • [7] Firms Operating under Electricity Constraints in Developing Countries
    Alby, Philippe
    Dethier, Jean-Jacques
    Straub, Stephane
    [J]. WORLD BANK ECONOMIC REVIEW, 2013, 27 (01) : 109 - 132
  • [8] Using referenda to improve targeting and decrease costs of conditional cash transfers
    Alix-Garcia, Jennifer M.
    Sims, Katharine R. E.
    Phaneuf, Daniel J.
    [J]. JOURNAL OF PUBLIC ECONOMICS, 2019, 176 : 179 - 194
  • [9] How Do Electricity Shortages Affect Industry? Evidence from India
    Allcott, Hunt
    Collard-Wexler, Allan
    O'Connell, Stephen D.
    [J]. AMERICAN ECONOMIC REVIEW, 2016, 106 (03) : 587 - 624
  • [10] Almanzar M., 2019, TECHNICAL REPORT