Scheduling with generalized batch delivery dates and earliness penalties

被引:16
作者
Yang, XG [1 ]
机构
[1] Chinese Acad Sci, Inst Syst Sci, Lab Management Decis Informat Syst, Beijing 100080, Peoples R China
基金
中国国家自然科学基金;
关键词
D O I
10.1080/07408170008967431
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
In this paper, we study some single machine scheduling problems with generalized batch delivery dates and earliness penalties. The generalized delivery dates are given a-priori before any jobs are processed. They are unrelated to the jobs and the processing order. Each specific delivery batch contains jobs completed but undelivered until the specific delivery date. We consider scheduling problems to minimize two types of earliness penalties: one is the total earliness; the other is the maximum earliness. For these two problems, first we show that they are NP-hard in the strong sense for general cases; then we prove that they are still NP-hard even if there are only two generalized batch dates. We also prove that they are solved in polynomial time for general earliness penalty function if all processing times are equal, acid give an O(n log(n)) algorithm to solve the weighted earliness cases.
引用
收藏
页码:735 / 741
页数:7
相关论文
共 18 条
[1]  
[Anonymous], 1979, Computers and Intractablity: A Guide to the Theoryof NP-Completeness
[2]  
CHENG TCE, 1993, ASIA PAC J OPER RES, V10, P145
[3]   BATCH DELIVERY SCHEDULING ON A SINGLE-MACHINE [J].
CHENG, TCE ;
GORDON, VS .
JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1994, 45 (10) :1211-1215
[4]   Single machine scheduling with batch deliveries [J].
Cheng, TCE ;
Gordon, VS ;
Kovalyov, MY .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 94 (02) :277-283
[5]   Single machine scheduling to minimize batch delivery and job earliness penalties [J].
Cheng, TCE ;
Kovalyov, MY ;
Lin, BMT .
SIAM JOURNAL ON OPTIMIZATION, 1997, 7 (02) :547-559
[6]   MINIMIZING TOTAL TARDINESS ON ONE MACHINE IS NP-HARD [J].
DU, JZ ;
LEUNG, JYT .
MATHEMATICS OF OPERATIONS RESEARCH, 1990, 15 (03) :483-495
[7]   ON THE COMPLEXITY OF GENERALIZED DUE DATE SCHEDULING PROBLEMS [J].
HALL, NG ;
SETHI, SP ;
SRISKANDARAJAH, C .
EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1991, 51 (01) :100-109
[8]   SCHEDULING PROBLEMS WITH GENERALIZED DUE DATES [J].
HALL, NG .
IIE TRANSACTIONS, 1986, 18 (02) :220-222
[9]  
HALL NG, 1997, SCHEDULING FIXED DEL
[10]  
Lawler E., 1976, Combinatorial Optimization: Networks and Matroids