A review on job shop scheduling with setup times

被引:37
作者
Sharma, Pankaj [1 ,2 ]
Jain, Ajai [1 ]
机构
[1] Natl Inst Technol, Dept Mech Engn, Kurukshetra, Haryana, India
[2] Guru Jambheshwar Univ Sci & Technol, Dept Mech Engn, House D-45,Univ Campus, Hisar 125001, Haryana, India
关键词
Job shop scheduling; setup times; review; SEQUENCE-DEPENDENT SETUP; GENETIC ALGORITHM; BOUND METHOD; OPTIMIZATION; HEURISTICS;
D O I
10.1177/0954405414560617
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Job shop scheduling problems with setup times arise in many practical situations such as aerospace industries, fabrication industries, printing industries and semiconductor manufacturing industries. This is the first article which provides a comprehensive review of the literature on job shop scheduling research involving setup times. The literature is classified into two broad categories, namely, job shop scheduling problems with non-batch (job) setup times and job shop scheduling problems with batch setup times. The two categories are subcategorized into problems with sequence-dependent setup times and sequence-independent setup times and review the exact, hybrid and heuristic solution methods used for each subcategory. Furthermore, it summarizes the existing research and identifies directions for future research.
引用
收藏
页码:517 / 533
页数:17
相关论文
共 85 条
  • [1] THE SHIFTING BOTTLENECK PROCEDURE FOR JOB SHOP SCHEDULING
    ADAMS, J
    BALAS, E
    ZAWACK, D
    [J]. MANAGEMENT SCIENCE, 1988, 34 (03) : 391 - 401
  • [2] Cyclic scheduling heuristics for a re-entrant job shop manufacturing environment
    Aldakhilallah, KA
    Ramesh, R
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2001, 39 (12) : 2635 - 2657
  • [3] A review of scheduling research involving setup considerations
    Allahverdi, A
    Gupta, JND
    Aldowaisan, T
    [J]. OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 1999, 27 (02): : 219 - 239
  • [4] A survey of scheduling problems with setup times or costs
    Allahverdi, Ali
    Ng, C. T.
    Cheng, T. C. E.
    Kovalyov, Mikhail Y.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 985 - 1032
  • [5] The significance of reducing setup times/setup costs
    Allahverdi, Ali
    Soroush, H. M.
    [J]. EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 187 (03) : 978 - 984
  • [6] [Anonymous], P INT MULT ENG COMP
  • [7] [Anonymous], INT J MANAG SCI
  • [8] [Anonymous], 1981, Multi-Objective Decision Making-Methods and Application. A State-of-the-Art Study
  • [9] [Anonymous], 17 INT WORKSH ART IN
  • [10] [Anonymous], OPR9106 U TEX AUST G