Optimization of hydropower system operation by uniform dynamic programming for dimensionality reduction

被引:70
作者
Feng, Zhong-kai [1 ]
Niu, Wen-jing [2 ]
Cheng, Chun-tian [2 ]
Wu, Xin-yu [2 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Hydropower & Informat Engn, Wuhan 430074, Hubei, Peoples R China
[2] Dalian Univ Technol, Inst Hydropower & Hydroinformat, Dalian 116024, Peoples R China
关键词
Multireservoir system operation; Dynamic programming; Uniform design; Dimensionality reduction; Curse of dimensionality; PARTICLE SWARM OPTIMIZATION; CULTURAL DIFFERENTIAL EVOLUTION; 3; GORGES; GENETIC ALGORITHM; ECONOMIC EMISSION; UNIT COMMITMENT; DESIGN; POWER; ENERGY;
D O I
10.1016/j.energy.2017.06.062
中图分类号
O414.1 [热力学];
学科分类号
摘要
As a popular optimization tool for multi-stage sequential decision problems, dynamic programming (DP) has been widely used to handle with hydropower system operation problems. However, the DP computational burden shows an exponential growth with the increasing number of hydroplants, which results in "the curse of dimensionality" and limits its application to resolve large and complex hydropower operation problem. Thus, this paper presents a novel modified DP algorithm called uniform dynamic programming (UDP) to alleviate the dimensionality problem of dynamic programming. In UDP, the uniform design is first used to construct the state variables set of each period by selecting some small but representative discrete state combinations, and then the DP recursive equation is used to find an improved solution for the next computation cycle. The UDP method is tested in the Wu River cascaded hydropower system of southwest China. The results indicate that the proposed UDP algorithm has competitive performance in computational efficiency and convergence speed, which is an effective tool for hydropower operation problem. (c) 2017 Elsevier Ltd. All rights reserved.
引用
收藏
页码:718 / 730
页数:13
相关论文
共 53 条
[31]   Hydropower licensing and climate change: Insights from cooperative game theory [J].
Madani, Kaveh .
ADVANCES IN WATER RESOURCES, 2011, 34 (02) :174-183
[32]   Estimated impacts of climate warming on California's high-elevation hydropower [J].
Madani, Kaveh ;
Lund, Jay R. .
CLIMATIC CHANGE, 2010, 102 (3-4) :521-538
[33]   Multi-Core Parallel Particle Swarm Optimization for the Operation of Inter-Basin Water Transfer-Supply Systems [J].
Peng, Yong ;
Peng, Anbang ;
Zhang, Xiaoli ;
Zhou, Huicheng ;
Zhang, Lin ;
Wang, Wenzhong ;
Zhang, Zixin .
WATER RESOURCES MANAGEMENT, 2017, 31 (01) :27-41
[34]   Simulation-Optimization Modeling: A Survey and Potential Application in Reservoir Systems Operation [J].
Rani, Deepti ;
Moreira, Maria Madalena .
WATER RESOURCES MANAGEMENT, 2010, 24 (06) :1107-1138
[35]   Coordinated operations of large-scale UHVDC hydropower and conventional hydro energies about regional power grid [J].
Shen, Jianjian ;
Cheng, Chuntian ;
Cheng, Xiong ;
Lund, Jay R. .
ENERGY, 2016, 95 :433-446
[36]   Optimization of peak loads among multiple provincial power grids under a central dispatching authority [J].
Shen, Jianjian ;
Cheng, Chuntian ;
Wu, Xinyu ;
Cheng, Xiong ;
Li, Weidong ;
Lu, Jianyu .
ENERGY, 2014, 74 :494-505
[37]   Long-term scheduling of large cascade hydropower stations in Jinsha River, China [J].
Wang, Chao ;
Zhou, Jianzhong ;
Lu, Peng ;
Yuan, Liu .
ENERGY CONVERSION AND MANAGEMENT, 2015, 90 :476-487
[38]   Optimization of the coagulation-flocculation process for pulp mill wastewater treatment using a combination of uniform design and response surface methodology [J].
Wang, Jian-Ping ;
Chen, Yong-Zhen ;
Wang, Yi ;
Yuan, Shi-Jie ;
Yu, Han-Qing .
WATER RESEARCH, 2011, 45 (17) :5633-5640
[39]  
Wang Y., 1981, KEXUE TONGBAO, V26, P485
[40]   Daily Generation Scheduling of Cascade Hydro Plants Considering Peak Shaving Constraints [J].
Xie, Mengfei ;
Zhou, Jianzhong ;
Li, Chunlong ;
Lu, Peng .
JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2016, 142 (04)