Risk Analysis for the Construction Phases of Long-Span CFST Arch Bridge based on finite element analysis

被引:0
作者
Zhang Yu-feng [1 ]
Sun Guo-fu [2 ]
机构
[1] China Univ Min & Technol, Sch Mech & Civil Engn, Beijing 100028, Peoples R China
[2] Shandong Univ Finance, Sch Business Adm, Jinan 250014, Peoples R China
来源
ADVANCED RESEARCH ON AUTOMATION, COMMUNICATION, ARCHITECTONICS AND MATERIALS, PTS 1 AND 2 | 2011年 / 225-226卷 / 1-2期
关键词
Risk analysis; Construction phases; Finite element analysis;
D O I
10.4028/www.scientific.net/AMR.225-226.823
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
As a part of virtual simulation of construction processes, this paper deals with the quantitative risk analysis for the construction phases of the CFST arch bridge. The main objectives of the study are to evaluate the risks by considering an ultimate limit state for the fracture of cable wires and to evaluate the risks for a limit state for the erection control during construction stages. Many researches have been evaluated the safety of constructed bridges, the uncertainties of construction phases have been ignored. This paper adopts the 3D finite element program ANSYS to establish the space model of CFST Arch Bridge, and to calculate the linear, the geometrical nonlinear and the double nonlinear buckling safety factors under the six different lode cases. Then the bridge's risks are evaluated according to the results calculated which provide a reference for design of similar project.
引用
收藏
页码:823 / +
页数:2
相关论文
共 50 条
[31]   Bridge structure design and finite element analysis [J].
XiaolinZhang ;
TianyiGuan ;
LeiFan ;
NaWang ;
LiShang ;
LianzhouYu .
SECOND IYSF ACADEMIC SYMPOSIUM ON ARTIFICIAL INTELLIGENCE AND COMPUTER ENGINEERING, 2021, 12079
[32]   Finite Element Analysis of Cracks on Railway Bridge Pier Based on ANSYS [J].
Xun, Wu ;
Jie, Li ;
Zhang Zhichao ;
Yi Xianshui .
2014 7TH INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION (ICICTA), 2014, :947-950
[33]   Broken cable-induced dynamic response of long-span concrete cable stayed bridge during construction [J].
Zhang Y. ;
Fang Z. ;
Lu J. ;
Xiang Y. ;
Long H. .
Zhendong yu Chongji/Journal of Vibration and Shock, 2021, 40 (05) :237-246
[34]   Caisson-Bored Pile Composite Anchorage Foundation for Long-Span Suspension Bridge: Feasibility Study and Parametric Analysis [J].
Zhao, Xiaoqing ;
Gong, Xiaonan ;
Guo, Panpan .
JOURNAL OF BRIDGE ENGINEERING, 2022, 27 (12)
[35]   Finite element analysis of square CFST beam strengthened by CFRP composite material [J].
Al Zand, Ahmed W. ;
Badaruzzaman, Wan Hamidon W. ;
Mutalib, Azrul A. ;
Qahtan, A. H. .
THIN-WALLED STRUCTURES, 2015, 96 :348-358
[36]   Finite Element Analysis of the Construction of the Tower of Pisa [J].
Hua, Sicen ;
Chen, Sitong ;
Wang, Ziqian ;
Qi, Wen ;
Zhang, Xianghui .
INTERNATIONAL CONFERENCE ON SMART TRANSPORTATION AND CITY ENGINEERING 2021, 2021, 12050
[37]   Finite element analysis of vehicle-bridge interaction [J].
Kwasniewski, Leslaw ;
Li, Hongyi ;
Wekezer, Jerry ;
Malachowski, Jerzy .
FINITE ELEMENTS IN ANALYSIS AND DESIGN, 2006, 42 (11) :950-959
[38]   Finite Element Analysis of a Novel Piezoelectric Arch Energy Harvester [J].
Li, Congjian ;
Li, Bing ;
Yang, Xiaojun ;
Meng, Max Q. -H. .
2015 IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND AUTOMATION, 2015, :2749-2754
[39]   Finite element analysis of the flexural behavior of square CFST beams at ambient and elevated temperature [J].
Javed, M. F. ;
Sulong, N. H. Ramli ;
Khan, N. B. ;
Kashif, S. .
PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON ADVANCES IN STEEL-CONCRETE COMPOSITE STRUCTURES (ASCCS 2018), 2018, :843-850
[40]   Cyclic tests and finite element analysis on hybrid fiber-cement-based composite encased CFST columns [J].
Li, Wei ;
Wang, Zhexiong ;
Li, Linfeng ;
Sun, Linzhu .
STRUCTURES, 2023, 58