Production scheduling optimization in foundry using hybrid Particle Swarm Optimization algorithm

被引:36
作者
Bewoor, Laxmi A. [1 ]
Prakash, V. Chandra [1 ]
Sapkal, Sagar U. [2 ]
机构
[1] KL Univ, Comp Sci & Engn Dept, Guntur 500002, India
[2] WCoE Shivaji Univ, Mech Engn Dept, Sangali 416415, India
来源
11TH INTERNATIONAL CONFERENCE INTERDISCIPLINARITY IN ENGINEERING, INTER-ENG 2017 | 2018年 / 22卷
关键词
No wait scheduling; total flow time; NP-hard; Combinatorial optimization; particle swarm optimization;
D O I
10.1016/j.promfg.2018.03.010
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Scheduling in foundry consist a type of production where, the hot work-in-processes cannot wait between two successive operations and can be modeled as a flow shop scheduling problem with no-wait constraint. With the objective to reduce total flow time, the appropriate sequence of jobs for scheduling is essential, hence the problem can be observed as typical NP-hard combinatorial optimization problem. This paper, proposes hybridization of Particle Swarm Optimization with simulated annealing for planning and scheduling issues which are very complex because of the ever changing needs of customers and existing constraints in foundry. This Proposed Hybrid Particle Swarm Optimization algorithm represents solution by random key representation rule for converting the continuous position information values of particles to a discrete job permutation. The proposed hybrid particle swarm optimization algorithm initializes population efficiently with Nawaz-Enscore-Ham heuristic and uses evolutionary search guided by the mechanism of PSO and local search by mechanism of simulated Annealing by balancing both global exploration and local exploitation. The proposed hybrid particle swarm optimization algorithm try to bridge the gap between theory and practice by considering foundry environment, which will help planner to decide the sequence of production of jobs based against clients' orders and to develop efficient scheduling procedures for minimizing total flow time with relatively low computational efforts. Extensive computational experiments are carried out based on various casting's (job's) characteristics viz. casting type, mould size and type of alloy, where size of job (n) considered as 10,12,20,50 and 100. With respect to performance measure, Average Relative Percent Deviation which is popular in the scheduling literature, the proposed method performs better than Simulated Annealing and Particle Swarm Optimization. (C) 2018 The Authors. Published by Elsevier B.V.
引用
收藏
页码:57 / 64
页数:8
相关论文
共 18 条
[1]   Production scheduling in a market-driven foundry: a mathematical programming approach versus a project scheduling metaheuristic algorithm [J].
Ballestin, Francisco ;
Mallor, Fermin ;
Mateo, Pedro M. .
OPTIMIZATION AND ENGINEERING, 2012, 13 (04) :663-687
[2]  
Bean J. C., 1994, ORSA Journal on Computing, V6, P154, DOI 10.1287/ijoc.6.2.154
[3]  
Bewoor L., 2017, INT J ELECT COMPUT E, V7, P31
[4]  
Bewoor L., 2016, INT J ENG TECHNOL, V8, P3021
[5]  
Blum Christian, 2012, Theory and Practice of Natural Computing. Proceedings of the First International Conference, TPNC 2012, P1, DOI 10.1007/978-3-642-33860-1_1
[6]   Metaheuristics in combinatorial optimization: Overview and conceptual comparison [J].
Blum, C ;
Roli, A .
ACM COMPUTING SURVEYS, 2003, 35 (03) :268-308
[7]  
Eberhart R., 1995, MHS'95. Proceedings of the Sixth International Symposium on Micro Machine and Human Science (Cat. No.95TH8079), P39, DOI 10.1109/MHS.1995.494215
[8]   Scheduling jobs in an Alcan aluminium foundry using a genetic algorithm [J].
Gravel, M ;
Price, WL ;
Gagné, C .
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (13) :3031-3041
[9]   A combinatorial particle swarm optimisation for solving permutation flowshop problems [J].
Jarboui, Bassem ;
Ibrahim, Saber ;
Siarry, Patrick ;
Rebai, Abdelwaheb .
COMPUTERS & INDUSTRIAL ENGINEERING, 2008, 54 (03) :526-538
[10]   Heuristic algorithms for scheduling heat-treatment furnaces of steel casting industries [J].
Mathirajan, M. ;
Chandru, V. ;
Sivakumar, A. I. .
SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 2007, 32 (05) :479-500